Similar Projects
New Fire Station
New Construction
Conception
Woodburn, KY

Transpark Station and Northside Station 5/Public Safety Training Center - City of Bowling Green
Renovation
Conception
Less than $12,725,000 est. value
Bowling Green, KY 42128

Jeffersontown Police Headquarters
New Construction - 25,000 SF
Design
Jeffersontown, KY 40299

New Fire Station No. 1
New Construction - 15,500 SF
Design
Frankfort, KY

Jeffersontown Fire and EMS - Fire Station 4
New Construction - 17,500 SF
Bidding
$7,000,000 est. value
Jeffersontown, KY 40299

East Marshall New Fire Station
New Construction
Bidding
$300,000 est. value
Gilbertsville, KY 42044

Station 1 Bathroom Remodel
Renovation
Post-Bid
Louisville, KY 40291

Pleasure Ridge Park Fire Station 1
Renovation
Post-Bid
Louisville, KY 40258

Station 5 Renovations
Renovation
Results
Louisville, KY 40216

Garrard County EMS
Results
$3,200,000 est. value
KY

Hendron Fire New Station
New Construction
Construction
$1,200,000 est. value
Hendron, Paducah, KY 42003

Frankfort Fire Station Roof Repair.
Renovation
Construction
Frankfort, KY

Chestnut Street New Police Headquarters
New Construction
Conception
$40,000,000 est. value
Louisville, KY 40203

Versailles Downtown Revitalization
Renovation
Post-Bid
Versailles, KY

National Responders Preparedness Center (NRPC) Expansion
Infrastructure
Results
$6,115,705 est. value
Greenville, KY 42345

Reported 07/20/2022 08:43 AM
Project Title

Department of Criminal Justice Training Boonesborough Outdoor Firing Range Improvements - Kentucky Department of Criminal Justice Training

Physical Address View project details and contacts
City, State (County) Ford, KY   (Clark County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025,
Bids Due View project details and contacts
Estimated Value $1,757,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a fire / police facility in Ford, Kentucky. Conceptual plans call for site work for a fire / police facility. Department of Criminal Justice Training Boonesborough Outdoor Firing Range Improvements A detailed scope has not yet been determined This project is included in the city's 2022-2028 Capital Improvement Plan (CIP). As of July 19, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Fire/Police Station, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents