Similar Projects
Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Our Lady of the Rosary School Expansion
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL 33176

Ponce Park Tower
New Construction, Build-Out
Design
$67,500,000 est. value
Coral Gables, FL 33134

Alexan Crafts
New Construction, Build-Out - 465,650 SF
Design
$10,000,000 CJ est. value
Coral Gables, FL 33134

Evelyn Greer Park Playground Replacement
Infrastructure
Bidding
$365,000 est. value
Miami, FL 33156

Pierce Park Renovation Project
Renovation
Bidding
Coral Gables, FL 33133

Legacy at 36
New Construction - 298,892 SF
Post-Bid
$5,000,000 est. value
Miami, FL 33142

Andover Park Improvements
Post-Bid
Miami, Miami Gardens, FL 33179

Tree Island Park - Phase 1 Park Development
Results
Less than $4,465,700 est. value
Miami, FL 33194

Development of Dolphin Station Property
Results
Miami, FL 33128

Soleste Spring Gardens
New Construction
Construction
$36,000,000 est. value
Miami, FL

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Lake Sana Development
New Construction
Conception
Westview, FL 33147

Wynwood Station
New Construction, Build-Out - 9,000 SF
Design
Miami, FL 33137

New Park Improvements at Robert C. Welsh Jr. Park
Renovation
Bidding
South Miami, FL 33143

Last Updated 12/08/2021 09:12 AM
Project Title

Oak Grove Park Turf Conversion Lighting and Ada Compliance

Physical Address View project details and contacts
City, State (County) Miami, FL 33162   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,329,550
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment and materials required to comply with the intent of the work described in the contract documents to replace existing natural grass soccer field with artificial turf. Artificial turf includes new geotextile grid/fabric, new drainage system, new concrete curb with nailer board, new artificial turf and infill. This scope also includes, the installation of a new chain link fence with vehicular pipe gates and four pedestrian gates around the new soccer field; new soccer field sports lighting system; new outdoor WIFI system in various areas throughout the park; new concrete walk path with landscaping between the soccer field and NE 8th Avenue; new irrigation lines to be connected to the existing irrigation system; replace damaged bleachers with new bleachers and concrete pads surrounding the soccer field. Demo portions of existing concrete walk paths; install new ADA compliant concrete walk paths at various locations throughout the entire Oak Grove Park; install new park benches, trash receptacles, picnic tables and BBQ grills at various location.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents