Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

General Residential Construction Contractor
Term Contract
Bidding
Detroit, MI

Timber Ridge Tank Restoration
Infrastructure
Bidding
Waterford, MI

WestPark Mixed-Use Commercial - Phase 1: Site Development
New Construction - 145,000 SF
Post-Bid
Lansing, MI 48917

WWTP Wet Weather Storage Tank
Post-Bid
Whitmore Lake, MI 48189

Toilet Room Renovations
Renovation
Results
Flushing, MI 48433

Elkton Water Storage Tank Repairs and Painting
Results
Less than $260,000 est. value
Elkton, MI

Popeye's
Renovation - 2,510 SF
Construction
Lansing, MI 48911

Industrial Court - Renovation and Addition
Renovation, Addition - 20,307 SF
Pending Verification
Bloomfield Township, MI 48302

My Space Self-Storage
New Construction - 701,700 SF
Pending Verification
Eastpointe, MI 48021

SRF Wastewater Improvements - Segment 2
Infrastructure
Bidding
Burton, MI

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

DNR North Country Trail-Fiberglass Reinforced Polymer Boardwalk
Results
Lansing, MI 48909

Knorrwood Pines Water Storage
Infrastructure
Bidding
Waterford, MI

Underground Storage Tank System Removal at the ESC
Post-Bid
Clinton Township, MI 48038

Last Updated 01/27/2022 03:14 AM
Project Title

Furnish Fall Protection Improvements for Aeration Tanks 5 and 6

Physical Address View project details and contacts
City, State (County) Warren, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide complete fall protection safety measures as defined in the drawings, including guard rails, ladder positioning devices, and grating. Include all accessories as required for a complete installation. Refer to specifications and drawing photo sheet for additional requirements. Aeration Tank 5: Remove and dispose of existing guard rail access assembly – patch holes in concrete. Install new fixed, surface mount guardrails, transition plate and grating platform as noted. 4. Aeration Tank 6: Remove and dispose of existing guard rail access assembly. Install new fixed, surface mount guardrails and grating platform as noted 5. Both Tanks: Provide Mfr. standard stainless-steel ladder positioning device (for securing a removable ladder) mounted to Aeration Tanks 5 & 6 as shown on drawings. Relocate electrical and control equipment as required to accommodate new work – provide new to match existing for all damaged or deteriorated components affected by this work scope. Repair deteriorated concrete as indicated. 6. New safety systems design and installation must comply MIOSHA / OSHA standards and 2015 Michigan Building Code requirements. 7. Application of new fall protection safety systems must strictly follow the attached specifications. Installers to be certified by manufacturer, provide sealed engineered drawings, structural calculations for attachments to structure, and provide certification of equipment upon completion of installation. 8. Provide a 1-year Contractor Warranty for repairs. 9. Existing steel surfaces that are abraded by this work scope are to be brush painted with a cold galvanizing compound in compliance with Mfr. recommendations – Tnemec 90-97 Tnemezinc, Carboline Carbozinc 11 HSN, or Amercoat 68MCZ or ZRC product with 95% pure zinc dust. 10. Any existing paint damaged by work scope is to be touched up with paint as specified on drawing A-1, Item 6 to match existing. Abraded steel components are to be cold galvanized prior to painting. 11. Provide details of all attachments of new components to existing components for Owner’s Engineer review and approval. Contractor assumes responsibility for all altered components and must ensure that they continue to function as intended. 12. The integrity of all tank systems must be maintained at all times. Any damage to systems must be immediately repaired as part of this scope at the Contractor’s expense. 13. Provide (1) blank copy in electronic .PDF format to Owner of Manufacturer’s standard yearly inspection checklist form to document information required to be verified at each yearly inspection for all systems provided under this work scope. Form to include recommended procedures and guidelines for all inspections. 14. Hot Work Permits are required for any welding operations performed

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents