Similar Projects
East West Connector Roadway Safety Improvements - 2-217 - City of Smyrna
Infrastructure
Conception
$2,170,000 est. value
Smyrna, GA 30082

Windy Hill Parkway Improvements - 2-218 - City of Smyrna
Infrastructure
Conception
$1,230,000 est. value
Smyrna, GA 30080

South Cobb Drive Convenience Store
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Marietta, GA 30060

St. Benedict Episcopal School Middle School Classroom Building
New Construction, Infrastructure - 50,000 SF
Design
$7,000,000 CJ est. value
Smyrna, GA 30080

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - Design and Installation of New Signage for CobbLinc
Infrastructure
Post-Bid
$200,000 CJ est. value
Marietta, GA 30060

Florence Road at CH James Parkway
Infrastructure
Results
Powder Springs, GA

2022 Lmig Resurfacing
Infrastructure
Results
$1,039,977 est. value
Marietta, GA

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Space Shop Self Storage / Marietta
Addition, Demolition, Renovation, Infrastructure - 33,800 SF
Pending Verification
$20,000,000 CJ est. value
Marietta, GA 30066

Better Baseball Two
New Construction, Infrastructure - 15,000 SF
Pending Verification
$2,500,000 CJ est. value
Marietta, GA 30060

Greers Chapel Road Retail Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Kennesaw, GA 30152

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
$5,000,000 CJ est. value
Kennesaw, GA 30144

T32-D7-PCC-I285 MP3 to 17.5-130379
Infrastructure
Post-Bid

Last Updated 06/23/2023 04:04 PM
Project Title

Bob Callan Trunk Trail, Phase 2 - Segment B

Physical Address View project details and contacts
City, State (County) Marietta, GA 30060   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $4,562,001 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the construction of 10-foot wide multi-use path with a 2-foot curb and gutter and 1.5-foot buffer strip along Interstate North Parkway for approximately 0.4 miles to terminate at existing trail south of Windy Hill Road and Spectrum Circle; a pedestrian bridge with 12-foot clear width and 8-foot vertical clearance spanning Rottenwood Creek; and a trial head at the northeast corner of Windy Hill Road. Cobb County Water System work is included. Project Duration: The time allowed for performance of the project will be 365 days. This project is funded by Federal, State and local funds. Accordingly, the successful bidder will be required to comply with all applicable Federal and State rules and regulations, as well as those of Cobb County. Project must also conform to all Americans with Disabilities Act (ADA) regulations. All bidders submitting bids in excess of $2,000,000.00 shall be prequalified with the Georgia Department of Transportation (GDOT). All bidders submitting bids $2,000,000.00 or less shall be registered subcontractors or prequalified with GDOT. Subcontractors shall be prequalified or registered with GDOT. Davis Bacon wage rates for Cobb County, Georgia will also apply. A Disadvantaged Business Enterprise (DBE) PARTICIPATION GOAL OF 10% has been established for this project. Bidders are subject to the requirements of Title 49, Code of Federal Regulations, Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs. Contractors must submit a DBE Participation Schedule to the County with this bid and a final DBE report must be submitted at the end of a project. Any subsequent changes and/or substitutions of DBE firms from the original DBE Participation Schedule must be submitted and approved by the County in advance. Monthly DBE reports must be submitted with each monthly invoice. Bidders shall be required to document sufficient DBE participation to meet this goal, or alternatively document good faith efforts to do so. DBE firms must be certified with the Georgia Department of Transportation's Equal Employment Opportunity (EEO) office. Question should be sent via email no later than 2:00 PM on Friday March 3, 2023 to purchasing@cobbcounty.org

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents