Similar Projects
Lee Road East Tank Rehabilitation and Concrete Roof Coating - Various
Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
NY

Roof Repair Services
Term Contract
Post-Bid
Rochester, NY

Latta Road IRA Roof Replacement
Alteration
Results
Less than $50,000 est. value
Rochester, NY 14612

Crittenden IRA Roof Replacement
Alteration
Results
Less than $50,000 est. value
Rochester, NY 14623

Roofing Preventative Maintenance, Repair, and Replacement Services
Alteration
Post-Bid
Rochester, NY

Parks Roofing Improvements and Upgrades
Alteration
Results
Churchville, Honeoye Falls, North Chili, Pittsford, Rochester, NY 14428

Welcome Center Roof Replacement
Alteration
Post-Bid
$300,000 est. value
Brockport, NY 14420

South Avenue Firehouse High Roof Replacement
Alteration
Results
$156,000 est. value
Rochester, NY 14620

Building Roof Replacements at Seven (7) LNA Service Stations Located in NJ, NY & PA
Alteration
Post-Bid

Culver IRA Garage Roof Replacement
Alteration
Results
Less than $50,000 est. value
Rochester, NY 14609

Roof Repair
Renovation
Post-Bid
$200,000 CJ est. value
Rochester, NY 14604

Residence G-06 Roof Replacement at Hamlin Beach State Park
Alteration
Results
$51,500 to $71,000 est. value
Hamlin, NY 14464

Churchville-Chili Central School District CIP Phase 6-1 - Roofing Contract
Renovation
Post-Bid
$200,000 CJ est. value
Churchville, NY 14428

Arnett Branch Library Low Roof Restoration
Alteration
Results
Rochester, NY 14619

462 Parma Center Road - Roof and Painting
Alteration
Results
Hilton, NY 14468

Last Updated 02/24/2023 02:11 PM
Project Title

Cobbs Hill Reservoir Upper Gatehouse Low Roof Replacement

Physical Address View project details and contacts
City, State (County) Rochester, NY 14618   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $116,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT A - Lump Sum, General Construction (GC) The project consists of removing existing roofing from the low rear roof, installing a new EPDM membrane over the flat section and a metal roof on the gable section. A bid alternate for a new unit skylight to replace an existing metal exhaust unit. Schedule: Work to only begin when the Reservoir is drained, tentatively August 2023. This Contract Contains and Incentive Program for Employing Qualified City Residents, Apprenticeship Training Requirements; and New MWBE and Workforce Goals Requirements CONTRACT TYPE: This is a LUMP SUM contract. Buyer's Requirements Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Job Location 1530 Highland Avenue

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents