Similar Projects
Intersect Modif - SH 412B
Infrastructure
Conception
$4,120,000 CJ est. value
Chouteau, OK 74337

Right of Way - SH082
Infrastructure
Conception
$280,675 CJ est. value
Salina, OK 74365

Grade, Drain and Surface - US 69
Infrastructure
Design
$17,315,900 CJ est. value
Pryor, OK 74361

Pavement Rehabilitation - US 69
Infrastructure
Design
$16,553,256 CJ est. value
Pryor, OK 74361

Locust Grove Public Schools - 2022 Bond Projects - New Fieldhouse
New Construction, Infrastructure - 9,750 SF
Post-Bid
$3,000,000 CJ est. value
Locust Grove, OK 74352

Kenwood Community Center - Bid Package 1 Site Work Trades
Infrastructure
Post-Bid
$350,000 CJ est. value
Salina, OK 74365

Salina Collection System and WWTP
Renovation, Infrastructure
Results
$2,489,400 CJ est. value
Salina, OK 74365

Middle School Entry Addition - Adair Public Schools
Addition, Infrastructure - 1,145 SF
Results
$294,909 CJ est. value
Adair, OK 74330

Widen and Resurface - SH028
Infrastructure
Conception
$9,860,000 CJ est. value
Adair, OK 74330

Pavement Rehabilitation - SH 412
Infrastructure
Design
$9,900,082 CJ est. value
Locust Grove, OK 74352

Snowdale Park Asphalt Overlay and Stripping
Infrastructure
Post-Bid
$500,000 CJ est. value
Salina, OK 74365

Middle School Entry Addition - Bid Pack #13 Rebid
Addition, Infrastructure - 1,145 SF
Results
$76,263 CJ est. value
Adair, OK 74330

Safety Improvement - SH020
Infrastructure
Conception
$500,000 CJ est. value
Pryor, OK 74361

Intersect Modif - SH 412
Infrastructure
Design
$530,000 CJ est. value
Locust Grove, OK 74352

Cherokee Nation Kenwood Community Center Bid Package 2 - Rebid
New Construction, Infrastructure - 32,625 SF
Post-Bid
$8,200,000 CJ est. value
Salina, OK 74365

Last Updated 09/18/2023 09:14 AM
Project Title

FFA/AG Expansion and Remodel - Bond 2023 - Adair Public Schools

Physical Address View project details and contacts
City, State (County) Adair, OK 74330   (Mayes County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Site Development, Vocational School
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,047,536 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Result. Sitework Ground Leve $48,910.00 Concrete MCL Construction $70,000.00 Asphalt Moorhead Construction $3,500.00 Casework Figueroa Painting $6,670.00 Doors, HMF, and HW (Material) Scovil & Sides $49,414.00 Specialties (Material) Felix Thomson $14,908.00 Doors, HMF, HW & Spec. (Install) Campbell Install $13,198.50 Floor Covering and Tiling Andeco Flooring $31,900.00 Resinous (Epoxy) Flooring Jerry VanCleave $43,740.00 Drywall & Ceilings Standard Construction $125,018.00 Aluminum Storefronts & Glazing Alred Glass $49,290.00 Painting Figueroa Painting $10,780.00 Pre-Eng. Metal Building (PEMB) Vanguard Builders $148,120.00 HVAC Vickrey Heat & Air $186,911.00 Electrical Electrical Services $127,000.00 Plumbing Solano's Plumbing $137,439.00 Operable Partitions Best Companies $15,669.00 Low Voltage / Fire Alarm JE Systems $13,717.00 Bid Package #1: Sitework Bid Package #2: Concrete Bid Package #3: Asphalt Bid Package #4: Casework Bid Package #5A: Doors, HM Frames, Hardware and Specialties (Materials) Bid Package #5B: Doors, HM Frames, Hardware and Specialties (Install) Bid Package #6A: Floor Covering & Tiling Bid Package #6B: Resinous (Epoxy) Flooring Bid Package #7: Drywall & Ceilings Bid Package #8: Aluminum Storefronts & Glazing Bid Package #9: Painting Bid Package #10: Pre-Engineered Metal Bldg. (PEMB) Bid Package #11: HVAC Bid Package #12: Electrical Bid Package #13: Plumbing Bid Package #14: Operable Partitions Bid Package #15: Low Voltage / Fire Alarm Questions should be addressed to the Construction Manager, Schilt Management Services, Inc., Austin Snow at (918) 824-2800 or austin@schiltmanagement.com. Anticipated completion for the project will be on or before April 1st, 2024. Question Deadline 07/21/2023 at 12:00 PM CT

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents