Similar Projects
Last Updated | 09/18/2023 09:14 AM |
Project Title | FFA/AG Expansion and Remodel - Bond 2023 - Adair Public Schools |
Physical Address | View project details and contacts |
City, State (County) | Adair, OK 74330 (Mayes County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Site Development, Vocational School |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,047,536 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Result. Sitework Ground Leve $48,910.00 Concrete MCL Construction $70,000.00 Asphalt Moorhead Construction $3,500.00 Casework Figueroa Painting $6,670.00 Doors, HMF, and HW (Material) Scovil & Sides $49,414.00 Specialties (Material) Felix Thomson $14,908.00 Doors, HMF, HW & Spec. (Install) Campbell Install $13,198.50 Floor Covering and Tiling Andeco Flooring $31,900.00 Resinous (Epoxy) Flooring Jerry VanCleave $43,740.00 Drywall & Ceilings Standard Construction $125,018.00 Aluminum Storefronts & Glazing Alred Glass $49,290.00 Painting Figueroa Painting $10,780.00 Pre-Eng. Metal Building (PEMB) Vanguard Builders $148,120.00 HVAC Vickrey Heat & Air $186,911.00 Electrical Electrical Services $127,000.00 Plumbing Solano's Plumbing $137,439.00 Operable Partitions Best Companies $15,669.00 Low Voltage / Fire Alarm JE Systems $13,717.00 Bid Package #1: Sitework Bid Package #2: Concrete Bid Package #3: Asphalt Bid Package #4: Casework Bid Package #5A: Doors, HM Frames, Hardware and Specialties (Materials) Bid Package #5B: Doors, HM Frames, Hardware and Specialties (Install) Bid Package #6A: Floor Covering & Tiling Bid Package #6B: Resinous (Epoxy) Flooring Bid Package #7: Drywall & Ceilings Bid Package #8: Aluminum Storefronts & Glazing Bid Package #9: Painting Bid Package #10: Pre-Engineered Metal Bldg. (PEMB) Bid Package #11: HVAC Bid Package #12: Electrical Bid Package #13: Plumbing Bid Package #14: Operable Partitions Bid Package #15: Low Voltage / Fire Alarm Questions should be addressed to the Construction Manager, Schilt Management Services, Inc., Austin Snow at (918) 824-2800 or austin@schiltmanagement.com. Anticipated completion for the project will be on or before April 1st, 2024. Question Deadline 07/21/2023 at 12:00 PM CT |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |