Similar Projects
Reconstruction of Runway 12R-30L from Taxiway Romeo to Taxiway Golf - Project 2, Saint Louis Lambert International Airport
Infrastructure
Bidding
$57,033,820 est. value
Ferguson, MO 63145

St. Charles County Regional Airport - Construct Taxilanes
Infrastructure
Bidding
$75,000 est. value
Portage Des Sioux, MO 63373

Runway 12R-30L from Taxiway R to Taxiway G
Post-Bid
$15,079,000 est. value
Saint Louis, MO 63145

Rehabilitate Taxiway Alpha
Infrastructure
Post-Bid
Chesterfield, MO 63005

Rehabilitate Taxiway A
Infrastructure
Results
Kansas City, MO 64116

Terminal 2 Improvements Phase 2 - Lambert International Boulevard Intersection Improvements
Infrastructure
Results
$1,400,000 est. value
Saint Louis, MO 63145

Houston Memorial Airport
Infrastructure
Bidding
$300,000 est. value
Houston, MO 65483

Crack Seal, Micro-Surface and Re-Mark Parallel Taxiway, Apron And Taxilanes
Infrastructure
Post-Bid
Cameron, MO

Nevada Regional Airport (NVD) Project
Infrastructure
Results
$250,000 to $600,000 est. value
Nevada, MO

Maintenance of Runway Weather Information System
Term Contract
Post-Bid
Whiteman Air Force Base, MO

Primary Surface Obstruction Removal
Infrastructure
Results
Maryville, MO

Reconstruct Southeast Taxiway and East Apron Taxilane: Additive Alternate Reconstruct Southwest Taxiway
Infrastructure
Post-Bid
Perryville, MO 63775

Runway 9-27 Pavement Repairs
Infrastructure
Results
Kansas City, MO 64153

Rehabilitate Runway And Connecting Taxiway, Install Runway Edge Lights, REILs And PAPIs
Infrastructure
Post-Bid
Cuba, MO 65453

Butler Memorial Airport - Beacon Head Rehabilitation
Infrastructure
Results
Butler, MO 64730

Last Updated 05/05/2022 06:43 AM
Project Title

Replace Runway 28 PAPI Project

Physical Address View project details and contacts
City, State (County) Mountain View, MO 65548   (Howell County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the improvements on which bids are requested will require the following major construction items: • Installation of temporary airport safety measures to allow for construction operations. • Demolition and removal of one existing 4-Box PAPI and master unit. The existing foundations to remain in-place. • Construction of one new 4-Box PAPI, master unit, and concrete foundations. • Installation of new electrical wire, conduit, and junction cans. • Localized grading, seed & mulch around new units.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents