Similar Projects
SR 903/Ronald Vicinity - Culvert Lining
Infrastructure
Conception
$734,000 CJ est. value
Cle Elum, WA 98922

SR 903/Ronald Vicinity - Culvert Lining
Infrastructure
Conception
$734,000 CJ est. value
Cle Elum, WA 98922

Hospital Site Improvements
Infrastructure
Design
$1,570,000 CJ est. value
Ellensburg, WA 98926

I-90/Peoh Road Bridge EB - Deck Rehabilitation
Infrastructure, Renovation
Design
$6,410,000 CJ est. value
Cle Elum, WA 98922

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

RFQ Contractor - Cle Elum Dam Fish Passage Facility Adult Facility, Yakima River Basin Water Enhancement
Infrastructure
Post-Bid
$55,000,000 CJ est. value
Cle Elum, WA 98922

South Branch Canal Improvements
Infrastructure
Results
Ellensburg, WA

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

I-90/West Side Canal Bridge EB - Deck Rehabilitation
Infrastructure, Renovation
Design
$637,000 CJ est. value
Cle Elum, WA 98922

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Kachess Lake Road Culvert Replacement
Infrastructure
Results
$1,000,000 to $1,200,000 est. value
Easton, WA 98925

I-90/Price Creek Vic to Cabin Creek I/C Phase 4 - Add Lanes/Wildlife Bridges
New Construction, Infrastructure
Design
$202,620,000 CJ est. value
Cle Elum, WA 98922

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Bloom Pavilion Addition
Infrastructure
Results
$1,520,000 CJ est. value
Ellensburg, WA 98926

I-82/Columbia River Bridge EB - Special Repairs
Infrastructure
Design
$1,079,000 CJ est. value
Ellensburg, WA 98926

Last Updated 02/20/2023 07:32 AM
Project Title

SR 906/Hyak Rd I/S vicinity - Replace Culvert

Physical Address View project details and contacts
City, State (County) Snoqualmie Pass, WA 98068   (Kittitas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected December 2025
Bids Due View project details and contacts
Estimated Value $1,890,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 590601J19 The two existing culverts at this location are deteriorating and have erosion issues. This project will replace the culverts with a single span open bottom culvert to increase culvert capacity and prevent erosion. As of February 20, 2023, this project is in conceptual status. Preliminary engineering is expected to be begin in the first quarter of 2020 and environmental design is expected to be completed in the third quarter of 2021. The contract advertisement is expected in fourth quarter of 2025 and construction is anticipated to be operationally complete in the fourth quarter of 2026. WSDOT - SR 906/Hyak Rd I/S vicinity - Replace Culvert *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents