Similar Projects
Charles City Road Sewage Pumping Station Interim Odor and Corrosion Mitigation
New Construction
Bidding
Richmond, VA 23231

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Rady Park Pump Station Replacement
Results
Warrenton, VA

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

Design Build Services of Ivy Creek Interceptor Division 5 and 6 and Route 460 Pump Station
Post-Bid
Roanoke, VA

Route 50 Pump Station Replacement
Results
$1,500,000 to $2,500,000 est. value
Winchester, VA

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Chain Bridge Pump Station Modifications Project P2663, Division 001
Results
Fairfax, VA

Pre-Qualification for Savile Lane Pump Station Rehabilitation
Post-Bid
$2,000,000 to $4,000,000 est. value
McLean, VA 22101

Last Updated 12/02/2021 08:39 AM
Project Title

Vinton Pump Station Improvements - Third Street Pump Station

Physical Address View project details and contacts
City, State (County) Vinton, VA 24179   (Roanoke County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to the Third Street Pump Station including associated site work, piping, mechanical, structural, electrical, and instrumentation components. Major equipment includes four 18 hp dry pit non-clog wastewater pumping units,100 kW generator, Sunapsys SCADA system, structural modifications and all associated appurtenances.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents