Similar Projects
J041--Chiller Maintenance
Post-Bid
Lyons, NJ 07939

J073--Kitchen Hood Exhaust Cleaning and Preventive Maintenance
Post-Bid
East Orange, Lyons, NJ

J041--Service Contract Air Handling Units
Results
Lyons, NJ 07018

Emergency Repairs As Needed for Heating, Ventilating and Air Conditioning Systems
Results
Somerset, NJ 08873

Replacement Of The Oil Fired Heater, Roof And Selected Exterior Windows
Post-Bid
Skillman, NJ 08558

Gym A/C Upgrades at Various Schools
- 10,136 SF
Results
North Plainfield, NJ 07060

Gym A/C Upgrades at North Plainfield High School
Post-Bid
North Plainfield, NJ 07060

Bipolar Ionization Upgrades at Watchung Hills Regional High School
Results
Warren, NJ 07059

HVAC Upgrades and Window Replacement at Stony Brook Elementary School
Post-Bid
Branchburg, NJ 08876

Emergency Services Training Academy HVAC System Upgrade
Results
Less than $600,000 est. value
Hillsborough, NJ 08844

C1da--561A4-20-105 Install Lab Hood B-1
Post-Bid
$25,000 to $100,000 est. value
Lyons, NJ 07939

HVAC Renovations at Guidance Suite at Somerville High School
Results
Less than $40,000 est. value
Somerville, NJ 08876

HVAC and Mechanical Products
Term Contract
Post-Bid

South Cafeteria HVAC Upgrades at Watchung Hills Regional High School
Results
Watchung, NJ 07069

J041--Chiller Maintenance NJHCS
Post-Bid
Lyons, NJ 07939

Last Updated 01/13/2022 05:07 PM
Project Title

New RTUs at Harding Township Middle School

Physical Address View project details and contacts
City, State (County) NJ 08807   (Somerset County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of new rooftops at Harding Township Middle School, new rooftop units will provide cooling with new interior ductwork distribution and duct-mounted hot water coils connected to the existing hot water piping will provide heating to classroom spaces. The existing unit ventilators in each space will be removed and existing fin tube piping will be reused and infilled with new piping where UVs are removed. The new RTUs will be sized for MERV 13 filters and specified with hot gas reheat for dehumidification and bipolar ionization equipment.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents