Similar Projects
Replace Pump Station and Drain field
Term Contract
Design
$250,000 to $500,000 est. value
Wisdom, MT 59761

Well House, Well 8 Project
Term Contract
Bidding
$250,000 est. value
Polson, MT

MBMG Blackfeet Well Drilling
Infrastructure
Post-Bid
Butte, MT

Beaverhead Deerlodge National Forest - Flint Creek Campground Well Drilling
Term Contract
Post-Bid
Philipsburg, MT 59858

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Kalispell Upper Zone Wells Project
Alteration
Results
$578,250 est. value
Kalispell, MT

New Wellhouse and Mainline Construction Project
Alteration
Post-Bid
MT

Municipal Groundwater Test Wells Project
Infrastructure
Results
Bozeman, MT 59715

Leon Johnson Hall Redundant Heat Pump Module Installation
Renovation, Infrastructure
Post-Bid
Bozeman, MT 59717

Construction of the East Helena Water Source Improvements 2022
Infrastructure
Results
East Helena, MT

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Opheim Mainline Project Schedule 4 - Pump Station and GSR
Infrastructure
Results
$3,900,000 est. value
Opheim, MT

Falcon Hollow Well - 2
Infrastructure
Post-Bid
Bozeman, MT

Kalispell Wells Project
Infrastructure
Post-Bid
Kalispell, MT

I-94 - Custer Replacement Well
Infrastructure
Post-Bid
Custer, MT

Last Updated 04/28/2022 08:59 AM
Project Title

Install Dewatering System at Lf D-2 Synopsis

Physical Address View project details and contacts
City, State (County) Malmstrom AFB, MT   (Cascade County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of the installing a new interceptor trench, geodrain and toe drain, and discharge lines, connecting new drains to the existing sump pump discharge lines, and abandoning old monitoring wells. The contractor shall provide all plant, labor, equipment, supervision, services, and materials to execute and satisfy the requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents