Similar Projects
Fuel Farm Aircraft Fueling Facility
New Construction, Alteration - 18,900 SF
Design
Wheeling, IL 60090

Southwest 3rd Avenue Natural Gas Replacement
Infrastructure
Bidding
Aledo, IL 61231

Public Works Facility Fuel Dispenser Removal and Installation
Infrastructure
Bidding
Des Plaines, IL 60016

Natural Areas Maintenance and Controlled Burning Services
Term Contract
Post-Bid
Half Day, IL 60069

Two Dri-Steam Gas to Steam Humidifiers
Post-Bid
Des Plaines, IL 60016

2020 Underground Storage Tank System Removal
Results
Warrenville, IL 60555

Installation of One (1) Above Ground Diesel Fuel Storage Tank
Results
Addison, IL 60101

2021 Lasalle County Highway Fuel
Term Contract
Post-Bid
Ottawa, IL

Rehabilitation of the 750,000 Gallon Spheroid High Tank
Results
Carol Stream, IL

2021 Above Ground Fuel Tank
Term Contract
Post-Bid
Richton Park, IL

Removal Of Underground Storage Units
Results
Rockford, IL 61109

Underground Storage Tank System Upgrade
Infrastructure, Alteration
Post-Bid
River Forest, IL

Underground Fuel Storage
Results
Downers Grove, IL

Maintenance Garage Insulation and Underground Storage Tank
Infrastructure
Post-Bid
Milan, IL

Underground Storage Tank System Upgrade - Transportation Department
Results
Algonquin, Carpentersville, IL 60102

Reported 02/23/2022 04:01 PM
Project Title

Oil Tank Abatement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60607   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work is to include: - Removal of one UST. - Repair of foundation wall repairs in the sub-basement related to the UST. - Removal of all unidentified equipment and debris. - The contractor is to provide all the management, supervision, manpower, equipment and supplies necessary for this project. There is no technical or contractual history for this project due to the nature of this procurement. This work cannot be performed in-house nor can this work be accomplished through modification of an existing contract. The anticipated award date is approximately 04/21/2021.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents