Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

Restore AHU-10 System or S 5-7
Term Contract
Bidding
$500,000 to $1,000,000 est. value
Louisville, KY 40206

Bingham Gardens HVAC Upgrades
Alteration
Bidding
$150,750 est. value
Louisville, KY 40216

Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Fire Department Vehicle Exhaust Extraction System
Post-Bid
Fort Mitchell, KY 41017

HVAC Preventative Maintenance, NWS Paducah, KY
Results
Paducah, KY

Walton Verona High School Rooftop Equipment
Results
Walton, KY 41094

College of Education IAQ Improvements
Alteration
Bidding
Louisville, KY

Hazelwood HVAC System Replacement
Post-Bid
Less than $48,000 est. value
Louisville, KY

Replace Basement Windows at Golden Tower With Some Limited Acoustical Ceiling and HVAC Work
Results
Covington, KY

Split System and Rooftop A/C Replacement
Alteration
Bidding
Louisville, KY 40212

Replacing HVAC Units in All of Boyd County Courthouse
Post-Bid
Catlettsburg, KY 41129

Cedar Creek WQTC - Effluent Parshall Flume Upgrade
Results
$1,000,000 to $2,000,000 est. value
Louisville, KY 40291

Boone County Schools Geothermal Upgrades Phase 2
Post-Bid
KY

Salato Education Center HVAC Replacement
Results
Less than $524,000 est. value
Frankfort, KY

Last Updated 12/16/2021 10:31 PM
Project Title

Central Lab Air Handler Replacement (Rooftop Exhaust)

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,457,840
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project is to demolish four (4) existing roof top exhaust (RTE) units, provide and install four (4) replacement RTE units and perform all necessary trades to bring new units on-line. These four units are specifically identified as being RTE-1, RTE-2, RTE-3, RTE-4 as identified in the design documents. The roofing system is to be protected during construction and architectural screen wall assemblies to be temporarily supported and re-braced. Project to include all necessary cranes and rigging to demolish existing equipment and install new rooftop mounted air handling units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents