Similar Projects
New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

Addison SD 4 2022 Capital Improvements Bid Package 004 Flooring
Renovation
Bidding
Addison, IL 60101

Barrington High School Campus
Renovation, Addition
Bidding
Barrington, IL 60010

Demolition of Properties
Post-Bid
Calumet City, IL 60409

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

Demolition of 2 Houses and Five Buildings on 3 Parcels and Debris Removal From 2 Parcels Along the Proposed US 67 Corridor
Demolition
Results
IL

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

Demolition and Site Clearance
Demolition
Bidding
IL

Prairie MS Campus and Station MS Campus
Post-Bid
Barrington, IL

Demolition
Results
Alton, IL 62002

2022 Summer School Improvements
Renovation
Bidding
Algonquin, Carpentersville, IL 60110

2021 Pavement and Playground Renovations
Renovation
Post-Bid
McHenry, IL 60050

Building Demolition at 3 Locations
Demolition
Results
McCullom Lake, IL 60050

Overhead Doors Inspections, Service, Maintenance, and Emergency Repairs
Term Contract, Alteration
Bidding
Arlington Heights, IL

Last Updated 12/06/2021 09:30 AM
Project Title

Health Life Safety Improvement - Tuckpointing and Window Replacement

Physical Address View project details and contacts
City, State (County) Carlinville, IL 62626   (Macoupin County)
Category(s) Education, Heavy and Highway, Single Trades
Sub-Category(s) Demolition, Middle/Senior High School, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of replacement windows, lintels and tuckpointing. Project includes but not limited to demolition, masonry cleaning, tuckpointing, masonry rebuilding, lashings and steel lintel replacement, associated interior inish and electrical work. All work is located at the Carlinville High School.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 04 - Masonry, Maintenance of Masonry, Maintenance of Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents