Similar Projects
Wastewater Treatment Plan Phase II - City of Herington
New Construction
Conception
$2,300,000 est. value
Herington, KS

East Intake Rehabilitation Water Treatment Plant
Renovation
Conception
$2,886,187 est. value
Topeka, KS

Hansen Water Treatment Plant Facility 1 Improvements Phase I
Renovation
Bidding
$7,500,000 est. value
Kansas City, KS 66106

Water Treatment Plant Improvements
Renovation
Bidding
$3,000,000 est. value
Belleville, KS

Kansas River Wastewater Treatment Plant Improvements
New Construction
Post-Bid
Lawrence, KS

Piping Improvements and Water Meter Replacement
Renovation, Infrastructure
Post-Bid
Less than $1,250,000 est. value
Wichita, KS 67205

Water Treatment Plant Improvements Phase 2
Results
Junction City, KS

Clinton Water Treatment Plant Piping Improvements
Results
Lawrence, KS 66047

West Filter Rehabilitation - 281240 - City of Topeka
Renovation
Conception
$2,530,362 est. value
Topeka, KS

Primary Clarifier 2 Repair or Replace Bent Frame Arm
Renovation
Bidding
$400,000 est. value
Topeka, KS 66616

WTP Turbidity and Actuator Upgrades
Renovation
Post-Bid
Emporia, KS 66801

Water Treatment Plant Improvements
Renovation
Results
Belleville, KS

West Plant Basin Rehabilitation - 281164.00 - City of Topeka
Renovation
Conception
Topeka, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Post-Bid
Wichita, KS 67203

Russell Water Treatment Plant A Improvements
Renovation
Results
Russell, KS 67665

Reported 07/13/2022 01:04 PM
Project Title

Chemical Building Rehabilitation

Physical Address View project details and contacts
City, State (County) Topeka, KS   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2024
Bids Due View project details and contacts
Estimated Value $945,101
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodeling of a water / sewer project in Topeka, Kansas. Conceptual plans call for the remodel of a wastewater treatment plant. This project will include structural repairs and modifications, mechanical equipment demolition and replacement, and electrical and lighting improvements for the Chemical Feed Building at the Water Treatment Plant. As of January 30, 2020, this project is in planning stage. It is currently unknown what approvals have been obtained. Information regarding design firm and general contractor selection has not been disclosed. A construction timeline has not been released. As of July 12, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents