Similar Projects
High-Tech Logistics Park / Mobile
New Construction, Infrastructure
Conception
$19,000,000 CJ est. value
Mobile, AL 36602

Canfor Southern Pines Sawmill Complex / Mobile County
New Construction, Infrastructure
Design
$210,000,000 CJ est. value
Axis, AL 36505

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Mobile, AL 36602

RFP - I-10 Mobile River Bridge Project
New Construction, Infrastructure
Bidding
$1,600,000,000 CJ est. value
Mobile, AL 36602

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Semmes Municipal Complex
New Construction
Post-Bid
Semmes, AL

Craft Highway 20" Water Main
Results
Mobile, Prichard, AL

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Murphy Oil #6987/7817 / Semmes
Demolition, New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Semmes, AL 36575

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

Barry 8 Power Plant Natural Gas Unit
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Bucks, AL 36512

Perch Creek Area Sanitary Sewer Trunk Line CIPP
Infrastructure
Bidding
$5,400,000 CJ est. value
Mobile, AL 36602

AMI Metering System (Contract B)
Infrastructure
Post-Bid
Axis, AL

Water Main Improvements from Tank 8 to Theodore Dawes Road
Results
Mobile, AL

Medical School Building Expansion and Renovation - University of South Alabama
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Mobile, AL 36608

Last Updated 09/30/2022 09:17 AM
Project Title

Bush Lane Water Main Relocation

Physical Address View project details and contacts
City, State (County) Theodore, AL 36582   (Mobile County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists primarily of open cut installation of 2,500 LF of 6" PVC C900 DR18 Water Main and associated appurtenances.Furnishing all labor and materials, and performing all work for constructing Contract No. 448910 Task 3, Bush Lane Water Main Relocation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents