Similar Projects
Bridge Repair
Renovation
Conception
$4,400,000 est. value
Schroeder, MN 55613

Mill and Overlay - TH 61
Infrastructure
Conception
$2,800,000 CJ est. value
Schroeder, MN 55613

B-364(5) Bridge Repair Enamels and Sealers
Renovation, Term Contract, Infrastructure
Post-Bid
$35,000 to $40,000 est. value

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 12 Bog Crossing Repairs
Results
$99,717 est. value
MN

CR 46 Cross River Bridge
Results
MN

Wisconsin Street Mixed Use
Demolition, New Construction, Infrastructure
Pending Verification
$527,100 CJ est. value
Grand Marais, MN 55604

Bridge Repair and Rehab - TH 61
Infrastructure
Conception
$2,000,000 CJ est. value
Schroeder, MN 55613

Grand Marais Overlook Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Grand Marais, MN 55604

Carlson Creek Bridge
New Construction, Infrastructure
Results
Hovland, MN 55606

Grading and Base for Paved Bituminous Multi-Use Trail and Concrete Crosswalk Landings
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Grand Marais, MN 55604

Bridge Beam Straightening - By County
Renovation, Term Contract, Infrastructure
Results

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

CR 45 Reconstruct
Infrastructure
Results
MN

Cook County Salt Sand Storage
Infrastructure
Results
$740,950 CJ est. value
Grand Marais, MN 55604

Last Updated 04/10/2023 07:06 PM
Project Title

Bridge 16J15 Over Junco Creek

Physical Address View project details and contacts
City, State (County) West Cook, MN 55604   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $429,600 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Located 2 Miles South of Two Island Lake Campground and 2.2 Miles North of Csah 8 on Cr 27 in the West Cook Ut Township Type of Work: Bridge Construction Major Items: Remove Existing Bridge, Structural Excavation, Common Excavation, Pre-cast Concrete Box Culvert, Pre-cast Concrete Box Culvert End Sections, Structural Backfill, Grading, Aggregate Surfacing %Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. Bids and required contractor forms must be completed in BidVault and accompanied by a Bidder's Bond in an amount equal to at least 5% of the total bid. The county reserves the right to reject any or all bids and to waive any irregularities thereof. The county reserves the right to adjust any and all quantities to stay within project funds.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents