Similar Projects
"The Node" Mixed-Use Development
New Construction - 305,060 SF
Conception
$10,000,000 CJ est. value
Cincinnati, OH 45220

Jeffrey Park - Phase 9
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Columbus, OH 43227

Bridge Park - Block F Podium Apartment Building
New Construction - 214,000 SF
Design
$10,000,000 CJ est. value
Dublin, OH 43017

Golden Bear Redevelopment
New Construction, Build-Out - 250,847 SF
Design
$56,000,000 est. value
Upper Arlington, OH 43221

Flying High Inc, Eagle's Nest II
New Construction - 3,261 SF
Post-Bid
$335,000 est. value
Youngstown, OH 44505

Silverton Assessment Center Renovation
Renovation - 2,800 SF
Post-Bid
Cincinnati, OH 45214

Design of New Public Works Department Office / Garage Building
New Construction, Demolition - 5,420 SF
Results
$1,261,172 est. value
Loveland, OH 45140

Renovation/Construction Required at the Silverton Assessment Center
Renovation
Results
Cincinnati, OH 45214

The Arts Lofts at the Arcade Block
New Construction - 2,970,000 SF
Construction
$90,000,000 est. value
Dayton, OH 45402

Arlington Gateway
New Construction, Renovation - 471,705 SF
Construction
$100,000,000 est. value
Upper Arlington, OH 43221

Geneva Area City Board of Education Office
Build-Out
Pending Verification
Geneva, OH

Velocity Corporate Center
New Construction
Pending Verification
North Ridgeville, OH 44039

Hunter International Expansion
New Construction - 21,000 SF
Conception
$5,000,000 est. value
Avon, OH 44011

Front & Fulton
Renovation - 172,310 SF
Design
Columbus, OH 43215

Spectrum
Renovation - 2,759 SF
Post-Bid
Elyria, OH 44035

Last Updated 04/01/2022 03:37 PM
Project Title

Paint Creek Remodel

Physical Address View project details and contacts
City, State (County) Bainbridge, OH 45612   (Ross County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all personnel, equipment, supplies, and materials necessary to complete the office remodel: Prices should include mob & de-mob, fuel, labor, material, and equipment to complete job. All the materials removed from the government property shall be disposed of in accordance with state, local and federal laws. - Install Drywall Over Existing Paneling - Installation of New Window in Managers Office

Details

Office, Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents