Similar Projects
2024 - AUB Water System Improvements Congress Parkway 8" Water Line Replacement Phase 3 Contracts 1 & 2
Infrastructure
Bidding
$200,000 CJ est. value
Athens, TN 37303

2024 - AUB Water System Improvements Congress Parkway 8" Water Line Replacement Phase 3 Contracts 1 & 2
Infrastructure
Bidding
$200,000 CJ est. value
Athens, TN 37303

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Planet Fitness / Athens
New Construction, Infrastructure - 15,000 SF
Post-Bid
$3,500,000 CJ est. value
Athens, TN 37303

2022 Water System Improvements Congress Parkway-8" Water Line Replacement-Phase 2
Infrastructure
Results
Athens, TN 37303

2020 - Athens Sewer System Improvements
New Construction, Infrastructure
Results
$4,621,383 CJ est. value
Athens, TN 37303

Piedmont Lithium Processing and Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$582,000,000 CJ est. value
Etowah, TN 37331

Athens City Schools Middle School Science Classrooms Addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$841,000 CJ est. value
Athens, TN 37303

911 Backup Center Renovation - Demolition and Replacement
Demolition, New Construction, Infrastructure
Results
$334,750 CJ est. value
Englewood, TN 37329

Athens Animal Shelter
New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Athens, TN 37303

McMinn High School Weight Room Addition
Addition, Demolition, Infrastructure
Results
$991,200 CJ est. value
Athens, TN 37303

Athens Public Safety Training Center - Site Work
Infrastructure
Post-Bid
$392,000 CJ est. value
Athens, TN 37303

Athens-Campus Transportation Improvements
Infrastructure
Post-Bid
$422,000 CJ est. value
Athens, TN 37303

Comprehensive Pedestrian & Vehicular Traffic Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Athens, TN 37303

Walgreens #17590 / Etowah
New Construction, Infrastructure - 2,501 SF
Post-Bid
$650,000 CJ est. value
Etowah, TN 37331

Last Updated 01/08/2024 09:06 AM
Project Title

2021 CDBG and ARPA Sewer System Improvements (Re-Bid)

Physical Address View project details and contacts
City, State (County) Englewood, TN 37329   (McMinn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: CONTRACT 2021-01 (CDBG): The base bid consists of the open cut replacement of approximately 739 LF of 8-inch & 10-inch gravity sewer, six (6) 4-foot Diameter Manholes, 300 GPM lift station, 2,150 LF of 6-inch PVC force main, service laterals, appurtenances, and incidental work. Also, to be considered in the contract is one (1) additive alternate for additional installation of approximately 1,405 LF of cured-in-place pipe of 8-inch gravity sewer, manhole rehab, service laterals, appurtenances, & incidental work. CONTRACT 2021-02 (ARPA): The base bid consists of open-cut replacement of approximately 879 linear feet of 12-inch & 15-inch gravity sewer, four (4) 4-foot diameter manholes, one (1) 5-foot diameter manhole, appurtenances, and incidental work. Also, to be considered in the contract are three (3) additive alternates for additional installation of approximately 2,400 LF of 8-inch & 12-inch cured-in-place pipe, 488 LF of 8-inch pipe bursting, manhole rehab, and service laterals, appurtenances, and incidental work. The Project has an expected duration of: CONTRACT 2021-01: 180 days Substantial Completion / 210 days Final Completion - If the Additive Alternate is awarded, 90 days will be added to CONTRACT 2021-01 CONTRACT 2021-02: 150 days Substantial Completion / 180 days Final Completion - If the Additive Alternate is awarded, 90 days will be added to CONTRACT 2021-02 The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed General Contractors as required by the Contractor's Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Joe Cline, Town Manager

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents