Similar Projects
Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

Mercy Health-Fairfield Hospital Campus Expansion
Addition, Demolition, New Construction, Infrastructure - 30,000 SF
Design
$20,000,000 CJ est. value
Fairfield, OH 45014

Punderson, Pymatuning and West Branch State Park Elevated Water Storage Tank Rehabilitation
Infrastructure
Bidding
$1,300,000 CJ est. value
Andover, OH 44003

FY23 - Miscellaneous
Infrastructure
Bidding
$2,823,296 CJ est. value
Lima, OH 45801

RFQ Design - New Industrial Trades Center - Belmont Technical Center
New Construction, Infrastructure
Post-Bid
$942,282 CJ est. value
Saint Clairsville, OH 43950

Ath Cr Var Resurfacing FY23 Paving
Infrastructure
Post-Bid
$2,800,367 CJ est. value
Athens, OH 45701

Lima Storage Unit Site Development
Infrastructure
Results
$83,000 est. value
Lima, OH 45806

Modoc Shaft
Infrastructure
Results
$70,866 est. value
OH

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

Freddy's Frozen Custard & Steakburgers / Fairfield
New Construction, Infrastructure - 3,000 SF
Pending Verification
$900,000 CJ est. value
Fairfield, OH 45014

New K-12 Building - Shadyside Local School District
New Construction, Infrastructure
Pending Verification
$47,000,000 CJ est. value
Shadyside, OH 43947

Roadway Minor Rehab - SR 11
Infrastructure
Design
$3,250,000 CJ est. value
Jefferson, OH 44047

Winchester Industrial Park Contract B - Pavement - Rebid
Infrastructure
Bidding
$1,977,486 CJ est. value
Winchester, OH 45697

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Last Updated 11/14/2022 10:12 AM
Project Title

Wildlife Boat Dock Removal and Deployment

Physical Address View project details and contacts
City, State (County) Lakeside Marblehead, OH 43440   (Ottawa County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,472 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Boat Dock Removal and Deployment for FMD2 in FY23 The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive. Question Deadline 09/07/2022 at 12:00 PM ET Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract. The awarded supplier will be required to sign an Addendum to Bid Quote or Personal Services Agreement. Example attached. All bidders must sign and attach the Standard Affirmation & Disclosure Form to their bid in Ohio Buys. This may be signed electronically through Adobe or through a wet signature. If this is not attached, the winning bidder will be asked to sign before a contract can be routed for review. soliciting bids for the removal of 7 boat docks this fall and their deployment next spring. These docks vary in size and location (see below) but are all stored on-site. We typically look to remove these in early December and deploy them between March 15 and 30th . All docks have wheels and can be pulled or pushed into position and will be stored in the parking lot near the boat ramps. All wheels must be set on wood blocks and chocked in place to prevent movement and protect the asphalt. The spring dates will depend on weather. For example, good fishing weather will push deployment towards the 15 th or cold spring weather, or ice may delay the work. Spuds can be stored at your facility, or you can transport them to our Willow Point Work Unit (6805 Wahl Rd., Vickery OH 43464). If you would like to visit the sites, please call to arrange a visit (Mike Wilkerson 419-429-8375).

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents