Similar Projects
Lake Montowac Dam Repairs
Infrastructure
Bidding
Montville, NJ

Woolman Lake Dam Repair Project
Infrastructure
Bidding
Mount Holly, NJ 08060

Removal of Bloomsbury Dam
Post-Bid
$2,000,000 to $5,000,000 est. value
Bloomsbury, NJ

Lake Montowac Dam Repairs
Post-Bid
Montville, NJ 07045

Hudsonia Lake Dam Removal
Results
Rockaway, NJ 07866

Crystal Spring Lake Dam Low Level Outlet Rehabilitation
Results
Ramsey, NJ 07446

Reconstruction of Bridge HL-73 on Lanes Pond Road and Rehabilitation of Lake Louise Dam
Renovation
Construction
Howell, NJ 07731

Lower Twin Lakes Dam Repair
Renovation
Post-Bid
Pompton Lakes, NJ

Inspections, Maintenance, Testing and Repair of the Carbon Monoxide ("Co") Monitoring Systems at the George Washington Bridge, and the Lincoln and Holland Tunnels
Results
Jersey City, NJ

Maurice River Bid
Infrastructure
Post-Bid
NJ

Reconstruction of Sunset Lake Dam (No. 34-01) Embankment Countermeasures
Results
$186,000 est. value
Bridgeton, NJ 08302

Decommissioning of Jericho Pond Dam (No. 34-20) and No Name Dam No. 119 (No. 35-26)
Results
$196,690 est. value
NJ

Reservoir 3 Site Safety Improvements
Results
Jersey City, NJ 07306

Cooks Pond Dam Improvements
Results
Denville, NJ 07834

Broad Street Lake Dam Spillway Replacement
Results
Woodbury, NJ 08096

Last Updated 02/01/2022 11:47 AM
Project Title

Ledgewood Pond Dam Improvements

Physical Address View project details and contacts
City, State (County) Roxbury, NJ   (Morris County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $360,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to lowering of lake in accordance with NJFW Water Lowering Permit; installation of temporary soil erosion and sediment control measures; construction of temporary cofferdam/piped stream diversion; tree stump and root mas grubbing from top of slope to toe of slope; resetting of monitoring wells, relocation of fishing line recycling bins, removing/resetting picnic tables, and removal of inactive poles/guy/lines; concrete repair work to existing outlet structure and coating repair of existing pipe; creation of 150' wide gabion basket auxiliary spillway; raising of berm east and west of auxiliary spillway and placement of trail surface treatment; construction of diaphragm drain around exposed piping; installation of 5' diameter manhole, concrete headwall with wingwalls and 36" RCCP, construction of concrete cradle and placement of gabions between wingwalls; grading, topsoiling, seeding and providing soil stabilization matting on exposed embankment slopes outside of spillway limits.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents