Similar Projects
GRCA 230561 Desert View Water Tank Rehab
Bidding
$100,000 to $200,000 est. value
AZ

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Water System Improvements
Results
$25,000 to $100,000 est. value
Flagstaff, AZ 86001

Inspect Clean Water Storage Tanks
Results
Glendale, AZ 85309

Water Tank Rehabilitation Project
Post-Bid
Snowflake, AZ 85937

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

New 300,000 Gallon Water Storage Tank at Well No. 4 Project
Post-Bid
Snowflake, AZ

Underground Storage Tank Removal
Results
$25,000 to $100,000 est. value
Tucson, AZ 85707

Livestock Storage Tanks
Post-Bid
Aguila, AZ

US EPA Tribal Nation Underground Storage Tank Program Support
Results

Pefo Replace Water Tank Ladder
Post-Bid

Summit 2 Water Tank
Results
$3,000,000 to $4,000,000 est. value
Prescott Valley, AZ 86314

Demolition of Existing Steel Water Storage Tank
Post-Bid
Canyon Day, AZ - Albuquerque, NM 85941

Elevated Water Storage Reservoir, Piping and Appurtenances
Results
Winslow, AZ

Reported 05/06/2021 12:00 AM
Project Title

Hospital Hill Tank Renovation

Physical Address View project details and contacts
City, State (County) Hayden, AZ   (Gila County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 04/09/21
Owner View project details and contacts
Architect View project details and contacts
Description

This project will repair these deficiencies by completing the following tasks: 1. Installing a temporary tank system to allow the Hospital Hill (HH) tank to be taken offline. 2. Draining and inspecting the HH tank for any additional repair needs. 3. Completing the additional repairs to the HH tank identified during the inspection. 4. Adding a cathodic protection coating on the outside of the HH tank to increase its service life. 5. Recoating of the interior metal surfaces of the HH tank. 6. Disinfecting, filling, and recommissioning of the HH tank. 7. Removing the temporary tank system. Coordination with ENGINEER for controls calibration will be required during the transition to the temporary tank system. The controls calibration and installation will be completed by OTHERS. This project is funded by the Colorado State Revolving Fund (SRF) .

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents