Similar Projects
Last Updated | 06/21/2021 05:01 PM |
Project Title | Massey Hill High School Media Center Carpet Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28306 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Existing carpet will be removed and replaced with carpet tiles. 1. Contractor to remove the existing carpet. Original floor tile is to remain in place. If it becomes necessary to remove the underlying tile, carpet removal will stop and CCS will abate the 9”x 9” tile before carpet tiles are installed. 2. Contractor will patch and prep floor to receive carpet tiles. 3. Contractor to install 1m square 100% Solution Dyed Branded Nylon carpet tiles per manufacturers recommendations. Tiles should be of heavy weight (22 oz.) and should meet design and installation specifications for severe traffic areas. Submittals will be required. 4. Contractor will install 6” Black rubber cove base and step trim where needed. 5. Contractor will be responsible for disposal of all materials. 6. CCS will move all furniture as needed. 7. Contractor will check in at office at the start of each work day. 8. Contractor will keep the work area safe and clean at all times. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |