Project Title | 67th Avenue Widening - Pinnacle Peak to Happy Valley - EN00100 - City of Peoria |
Physical Address | View project details and contacts |
City, State (County) | Glendale, AZ 85308 (Maricopa County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $16,704,328 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project provides for the coordination with adjacent property owners, developers, public involvement, study, design, right-of-way acquisition, intergovernmental agreements, utility coordination, utility relocation, burying overhead facilities, construction and construction administration for the widening and construction of 67th Avenue between Pinnacle Peak Road and Happy Valley Road, a 16" water line and a regional storm drain system. The regional storm drain system will be cost shared with the Flood Control District of Maricopa County (FCDMC). The cross section of the roadway improvements varies from four lanes to six lanes. The improvements will include burying overhead facilities, installation of a 16" waterline along 67th Avenue and Pinnacle Peak Road, installation of a regional storm drain system, storm drain laterals and catch basins, saw cutting and removal of existing pavement, installation of new curb, gutter, valley gutter and apron, sidewalk, and handicap ramps, landscape, and raised landscaped medians, streetlights, interconnect conduit and fiber, future traffic signal improvements, striping and signage. This project also includes intersection improvements at Happy Valley Road and 67th Avenue. The project is included in the city's 2023-2032 Capital Improvement Program (CIP). As of February 2, 2022, an engineer has been selected for the project. Construction project delivery is expected to be through a construction delivery method. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2023* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |