Similar Projects
Cottonwood Improvement District - Rehab 2021 Sewer Pipeline
Bidding
$1,000,000 to $2,999,999 est. value
Sandy, UT

Storm Water Improvement Projects
Bidding
$257,500 est. value
Riverdale, UT

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

Storm Drain Improvements in Canyon Near Lacey Way
Results
$500,000 to $600,000 est. value
North Salt Lake, UT

2019 Public Works Project
Results
Hyrum, UT 84319

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Utah Caldwell Wash Storm Drain Improvements
Results
Washington, UT 84780

Construction of the Cedar Heights Stormwater Improvements
Post-Bid
Kanab, UT 84741

Hillside Lane Storm Drain
Results
$150,000 to $200,000 est. value
Salt Lake City, UT 84106

Storm Drain Along Uprr Union Avenue to Main Street
Post-Bid
North Salt Lake, UT 84054

1700 East Storm Drain
Results
Springville, UT 84663

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

Last Updated 04/29/2021 10:44 AM
Project Title

2021 Utility Grade Adjustment Project

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $92,050
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally includes, but is not limited to the raising and lowering of manholes and valves. The Work to be constructed is located in the City of West Jordan at various locations as shown on the project drawings. Additional work may be requested from the awarded Vendor at a later date throughout the working season. If additional work is requested, the Vendor shall be required to maintain the same pricing structure as provided in the bid schedule. Where commodity market conditions apply, the City reserves the right to negotiate pricing with the awarded Vendor. If successful negotiations are achieved, the City will process a contract addendum to include the additional work requested.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents