Similar Projects
Bikeways - HAM Deer Park Bike/Ped Connector
Bidding
Deer Park, OH

New Parking Lot
Bidding
Cincinnati, OH 45238

Sidewalk - HAM Mt. Healthy SRTS 2017
Post-Bid
Mount Healthy, OH

Asphalt Parking Lot With Concrete Curb, Concrete Walk, and a Concrete Pad
Results
Woodlawn, OH 45215

2019 Street Resurfacing, Curb Removal and Replacement Project
Results
Less than $281,182 est. value
Fairfax, OH 45227

Miscellaneous - HAM-US 127-09.67
Bidding
North College Hill, OH

2915 Clifton Avenue Parking Lots Modifications
Results
Less than $425,000 est. value
Cincinnati, OH 45221

Little Miami Scenic Trail Newtown Road to Walton Creek
Results
Less than $730,000 est. value
OH

Sidewalk Reconstruction Program
Results
Madeira, OH 45243

Sunset Avenue Landslide Correction
Results
Cincinnati, OH 45202

Housing Repair Services - Accessibility Modifications
Term Contract
Results
Less than $50,000 est. value
Cincinnati, OH 45202

St Martins Place and Municipal Parking Lot Improvements
Results
Cheviot, OH

Pinecrest Apartment 3951 West Eighth Street New and Replacement of Concrete Walks, Curbs and Steps
Results
Cincinnati, OH 45214

Sidewalk Extensions Woodruff and Nordyke Roads Project
Results
Less than $130,000 est. value
Anderson, OH

2020 Sharon Road at South Troy Crosswalk
Results
Less than $34,698 est. value
Glendale, OH

Last Updated 04/01/2021 03:59 PM
Project Title

Wasson Way Phase 4+5

Physical Address View project details and contacts
City, State (County) OH   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract involves a Design Build approach for the construction of a shared use path from Eastern Hills Lane to Old Red Bank Road along the former railroad corridor and within Ault Park. The design work includes using City provided scope and preliminary design documents to complete all necessary project documents and obtain necessary approvals for construction work. Design scope includes professional services for: bridge structure rehabilitation, bridge deck design; shared used path line grade and typical design; drainage design; topographic, layout stake and as-built survey; landscape architect; and retaining wall design. Construction work involves the construction of new asphalt and concrete pavement to connect proposed shared use path to existing Wasson Phases to the west and existing trails to the east. The work of this contract includes the following: performing vegetation removal, earthwork, curbs, curb ramps; fence and railing; concrete walk; constructing asphalt and concrete paved trail; constructing storm water facilities; traffic control signage and pavement markings; constructing retaining walls; modifying an existing railroad bridge to shared use path bridge, including rehabilitation and painting of existing bridge superstructure; tree planting and site restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents