Similar Projects
US Business 24 at MP 0.146
Bidding
Less than $1,000,000 est. value
CO

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Bridge Design, Construction, and Delivery
Post-Bid
Platteville, CO 80651

Bridge Expansion Joint
Post-Bid
Denver, CO 80204

Mesa-16-Q.5 Bridge Replacement
Results
Less than $1,672,643 est. value
Grand Junction, CO 81501

Design-Build Services for Willow Springs Ponds Pedestrian Bridge
Results
$75,000 to $200,000 est. value
Colorado Springs, CO 80905

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

Hess Ranch Metropolitan District No. 6 – Filing 1 Bridges Project
Post-Bid
Parker, CO

Removal of Asphaltmat (Planing), Placement of Thin Bonded Polyester Concrete Overlay,Replacement of Bridge Joints and Bearings
Results
$5,000,000 to $20,000,000 est. value
Glenwood Springs, CO

Construction Management Services
Post-Bid
Englewood, CO 80110

Construction Manager (“CM”) Services
Results
CO

Wagon Creek Beekman Road Crossing
Post-Bid
San Luis, CO

High Line Canal Underpass at Hampden and Colorado
Results
$5,300,000 to $5,800,000 est. value
Denver, CO 80202

Steel Bridge Decking for Bridge No. 913
Post-Bid
Steamboat Springs, CO 80487

I-76 over Clear Creek Bridge Rehabilitation Project on MP 2.901 on I-76
Results
$1,000,000 to $5,000,000 est. value
CO

Reported 02/07/2020 12:00 AM
Project Title

Bridge Repair Project West 44th Ave over Clear Creek

Physical Address View project details and contacts
City, State (County) Wheat Ridge, CO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $300,000 to $350,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment and materials for a bridge rehabilitation project that includes replacing the existing expansion devices and repairing a pier cap. The expansion device in the middle of the bridge will be eliminated and the bridge expansion devices on each end of the bridge will be replaced. The bridge cannot be closed; two-way traffic will be maintained on the bridge at all times. Four lanes of traffic shall be maintained during the Carnation festival July 31st through August 10th. A 404 permit has been submitted for this project. Approximate quantities include: 136 LF of bridge expansion device, 11,730 LB of Epoxy coated reinforcing steel, 95 SY of asphalt removal, 31 Tons of asphalt.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents