Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

1810-20 N Wells Redevelopment
Addition, Demolition, Renovation, Infrastructure - 4,000 SF
Design
$7,000,000 CJ est. value
Chicago, IL 60614

AutoZone #3567 / Chicago
New Construction, Infrastructure - 30,000 SF
Bidding
$8,000,000 CJ est. value
Chicago, IL 60632

Parkland College - 2022 Reconstruct North Courtyard
Demolition, New Construction, Infrastructure
Bidding
$2,400,000 CJ est. value
Champaign, IL 61822

2021 Courtyard Improvements
Post-Bid
Tinley Park, IL 60477

H335--Underground Storage Tank Inspection and Maintenance Services
Term Contract
Post-Bid
Hines, IL 60141

Site Reconstruction
Results
Streamwood, IL 60107

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

New Fire Station #2 - 40805 - City Of Urbana
New Construction, Infrastructure
Conception
$2,741,400 CJ est. value
Urbana, IL 61802

Last Updated 10/06/2022 04:37 PM
Project Title

Water Tower Replacement Project

Physical Address View project details and contacts
City, State (County) Cullom, IL 60929   (Livingston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,729,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water Tower Replacement Project Installation of a new 125,000 gallon elevated storage tank and demolition of the existing 50,000 gallon elevated storage tank complete with hatches, vent piping and necessary appurtenances. Installation of approximately 125 feet of 10-inch water main. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), The Consolidated Appropriations Act, 2014. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. All proposals must have hard copies delivered and must be signed as required as well as accompanied by a bank cashier's check, certified check, or bid bond for not less than five percent (5%) of the amount of the bid. A performance bond in the amount of One Hundred Percent (100%) of the Contract will be required. The Davis Bacon Federal Prevailing Rate of Wages shall apply to this project. The Owner reserves the right to reject any or all proposals and to waive technicalities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents