Similar Projects
Brookside Ranch
New Construction
Conception
West Bountiful, UT 84087

Everly Apartments
New Construction
Conception
Farmington, UT 84025

Layton Hills Apartments
New Construction - 243,515 SF
Design
Layton, UT 84041

Altitude
New Construction
Design
Layton, UT 84040

Holiday Inn Express
Renovation
Post-Bid
Bountiful, UT 84010

Construction of the Fire Station Driveway and Auxiliary Building
Infrastructure
Post-Bid
South Weber, UT

Ewe Turn Street Rebuild Project
Infrastructure
Results
Farmington, UT

Antelope Island State Park, White Rock Bay Campground
Infrastructure
Results
$2,245,755 CJ est. value
Syracuse, UT 84075

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Second State Apartments
New Construction - 60,285 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Clearfield, UT 84015

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Trailside West
New Construction
Design
Layton, UT 84041

2022 200 North and 200 South Reconstruction Projects
Infrastructure
Post-Bid
$206,838 est. value
Bountiful, UT 84010

Last Updated 03/31/2023 01:21 PM
Project Title

Townplace Suites and Monterey West

Physical Address View project details and contacts
City, State (County) Syracuse, UT 84075   (Davis County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a mixed use development. As of March 31, 2023, construction is expected to start next week. The architect requests no email or phone inquiries. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time.

Details

4 Stories Above Grade, 51,000 SF. 3 Stories Above Grade, New Construction, New Construction. New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents