Similar Projects
Last Updated | 04/21/2023 01:34 PM |
Project Title | Central Plant #3, Secondary Pumps Replacement |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35210 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,299,956 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is primarily a maintenance pump replacement project. The existing chilled water secondary pumps in Central Plant #3 are beyond their service life and shall be replaced. The work shall involve, but not be limited to, replacement of five chilled water pumps along with the pumps associated isolation valves, flow control valve, check valve, suction diffuser and hydronic specialties. Electrical work shall include replacement of variable speed drives, replacement of VFD by-pass starters and reworking of the power feeds to all the pumps. Controls work shall include installation of new PLC devices along with reworking existing PLC devices. Controls work shall also include programming of the installed devices along with the existing plant devices requiring modifications. Work will be performed in an operating chilled water plant. All work shall be coordinated with UAB Central Plant Operations and UAB Project Management. Pump systems shall be replaced one at a time so that the new pump is operational prior to working on the next pump system. Additionally, work shall proceed only during weather that reduces loading on the University chiller plants system. Central Plant #3, Secondary Pumps Replacement located at 501 19th Street South Birmingham Alabama Prime Contractors that are properly licensed for this type of work are required to prequalify in order to bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |