Similar Projects
Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Slater Avenue Mixed Use Development
New Construction - 2,567,000 SF
Design
$10,000,000 CJ est. value
Kirkland, WA

Bellevue 600 Office Tower
New Construction - 98,084 SF
Design
Hunts Point, WA 98004

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Public Storage
New Construction - 81,041 SF
Post-Bid
Kent, WA 98032

KCSO Detective Unit Relocation
Renovation
Results
Seattle, WA 98104

Seattle Municipal Tower 32 and 33
Renovation
Results
$3,878,969 est. value
Seattle, WA 98104

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

Fujimatsu Village
New Construction - 25,000 SF
Conception
Seattle, WA 98104

Chapter Building 1
New Construction - 251,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Seattle, WA 98105

5600 Roosevelt Way
Renovation - 6,656 SF
Post-Bid
Seattle, WA 98105

Last Updated 06/23/2022 03:51 PM
Project Title

5th Avenue North Office Building

Physical Address View project details and contacts
City, State (County) Seattle, WA 98129   (King County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage, Retail
Contracting Method General Contractor to Subcontract.
Project Status Design Development, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $55,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a mixed-use development in Seattle, Washington. Working plans call for the construction of a 223,000-square-foot, eight-story above grade office development; 9,000-square-foot, one-story above grade retail development; and two-story below grade, 93-space parking garage. Plans call for the construction of a 223,000-square-foot, eight-story above grade office development; 9,000-square-foot, one-story above grade retail development; and two-story below grade, 93-space parking garage. As of June 20, 2022, the project is expected to commence construction prior to the end of July, 2022. Information regarding the architect has not been confirmed. A general contractor has been selected, however, information regarding the general contractor has not been made public at this time.

Details

,, 232,000 SF - Retail, 1 Story Above Grade, 9,000 SF New Construction, Office, 8 Stories Above Grade, 223,000 SF New Construction, Parking Garage, 2 Stories Below Grade, New Construction, 93 Parking Spaces.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents