Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Pompey Pillar National Monument Rock Stabilization
Infrastructure
Bidding
$5,000,000 CJ est. value
Pompeys Pillar, MT 59064

Saint Charles Mission School Parking Lot Reconstruction Rebid
Infrastructure
Bidding
$570,000 CJ est. value
Billings, MT 59101

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

Water System Improvements
Infrastructure
Results
Billings, MT 59105

Alkali Creek Water and Sewer Extension
Infrastructure
Results
Billings, MT

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Falcon Ridge 4 Plex
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Riverfront Park Trail - City of Billings
Infrastructure
Conception
$1,350,000 CJ est. value
Billings, MT 59101

Coca-Cola Bottling Companies New Facility / Billings
New Construction, Infrastructure
Design
$23,700,000 CJ est. value
Billings, MT 59101

Billings AFRC Water Recycler Removal
Infrastructure
Bidding
$70,000 CJ est. value
Billings, MT 59102

Last Updated 02/09/2023 03:42 PM
Project Title

2023 Billings Water Main Replacement

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,437,189 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of water main replacement work described in general by the following: Schedule 1: 3,010 LF of 12-inch PVC water main replacement in King Avenue East, Parkway Lane, and Southgate Drive, including fittings, valves, hydrants, service reconnections, and associated work. Schedule 2: 1,970 LF of 8-inch PVC water main replacement in Avenue F, including fittings, valves, hydrants, service reconnections, and associated work. Schedule 3: 3,780 LF of 8-inch PVC water main replacement in Parkhill Drive, Beverly Hills Boulevard, 19th Street West, and 21st Street West, including fittings, valves, hydrants, service reconnections, and associated work. Contractor and any of the Contractor's subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor & Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 406-444-7734. All laborers and mechanics employed by Contractor or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of Yellowstone County and the State of Montana. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the "City of Billings, Montana" in an amount not less than ten percent (10%) of the total amount of the bid. Successful bidders shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful Bidder(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail or hand delivered shall have any of the bid securities included. For further information concerning this project, please contact Paul Swenson, P.E., Project Manager for DOWL, by telephone at 406-869-6301 or by email at pswenson@dowl.com; or Travis Harris, P.E., at the Office of the City Engineer, 2224 Montana Avenue, Billings, MT 59101, by telephone at 406-657-3021 or by email at harrist@billingsmt.gov. The City of Billings is an Equal Opportunity Employer. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents