Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Southern Service Area Lift Station - 19-PWSew-002 - Village of Huntley
Infrastructure
Conception
$2,850,000,000 CJ est. value
Huntley, IL 60142

Residences at Fox Meadows
New Construction
Design
Bull Valley, IL 60050

Residences at Fox Meadows
New Construction
Design
Bull Valley, IL 60050

Intergenerational Inclusive Playground
Infrastructure
Bidding
$200,000 CJ est. value
Woodstock, IL 60098

Intergenerational Inclusive Playground
Infrastructure
Bidding
$200,000 CJ est. value
Woodstock, IL 60098

Cary Grove Park Aquatic Facility - Bid Release 1
Post-Bid
Cary, IL 60013

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Cleaning (Sweeping) Various Arterial Highways
Results

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Central Station Housing Development
New Construction
Pending Verification
Woodstock, IL 60098

Authentix McHenry Multifamily Development
New Construction
Pending Verification
McHenry, IL 60051

Huntley-Dundee Sanitary Sewer Replacement - 22-PWSew-004 - Village of Huntley
Infrastructure
Conception
$275,000 CJ est. value
Huntley, IL 60142

McHenry County SportsPlex / Lakewood Community Center / Chicagoland Sportsplex
New Construction, Infrastructure - 150,000 SF
Design
$45,000,000 CJ est. value
Woodstock, IL 60098

Provide Scour Protection System Services
Infrastructure
Bidding
$400,000 CJ est. value
Woodstock, IL 60098

Last Updated 08/25/2022 04:09 PM
Project Title

2022 Park Improvements Sterling Meadows, Hill Farm, Grand Oaks, and Administrative Center

Physical Address View project details and contacts
City, State (County) Crystal Lake, IL 60014   (McHenry County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Misc. Recreational, Park/Playground, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All bidders will submit, separate from the sealed bid, a resume of similar projects performed, enumerated, as to location, type of work, approximate completion date, and project engineering firms. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. Base bid work is at four park district operated sites in Crystal Lake Illinois The work for which proposals are requested will generally consist of, but shall not be limited to, the following: Pavement removal and reclamation, Base Course preparation, HMA paving, concrete curb and sidewalk installation, basketball court reconstruction; and other associated improvements. The successful bidder is required to pay the general prevailing wage for work under this Contract as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and the requirements of the Bidding Documents. Bid security in the form of a Bid Bond, Bank Cashier's Check, or Certified Check in the amount of TEN (10) percent of the total bid amount, made payable to the Crystal Lake Park District shall accompany the bid. The Crystal Lake Park District reserves the right to accept or reject any bid, to award all or part of a contract, and to make such awards as are in the best interests of the Park District. Factors other than price which will be considered in awarding or rejecting bids shall include the results of reference contacts, and the quality of the bidders performance on prior Park District projects, if any, in the judgment of the Park District Board and Park District staff. All proposals submitted shall be valid for a period of 60 days. Construction work is anticipated to start September 12, 2022, with substantial completion by November 18, 2022, and a final completion date of May 26, 2023. NOTE: Color coat work completion is proposed with a date of May 26, 2023. Final Completion is Defined as Restoration and Punch List Items Addressed on Court Construction, Except for Color Coat. Per Idot Specification 108.09, Delay Charges Assessed for Everyday Past Final Completion Date.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents