Similar Projects
District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

American Furniture Warehouse
New Construction - 443,375 SF
Design
TX

STAG Houston
Addition - 61,200 SF
Design
$4,800,000 est. value
Houston, TX 77061

General Contractor to provide Construction Services for Three Concrete Storm Shelters at Caddo Mounds SHS
New Construction
Bidding
Alto, TX 75925

Road and Bridge Pct 4 Building
New Construction
Bidding
El Campo, TX 77437

New Maintenance, Operations and Warehouse Facility Project
New Construction - 149,185 SF
Post-Bid
Less than $15,300,000 est. value
Pasadena, TX 77501

AAA Auto Club
Build-Out - 2,903 SF
Post-Bid
Cedar Park, TX 78613

Salt Shed, Colorado City MNT
Results
Less than $85,000 est. value
Colorado City, TX 79512

Salt Shed - Big Spring AEM
New Construction
Results
Less than $85,000 est. value
Big Spring, TX 79720

Cypress Preserve Logistics Center
New Construction - 91,000 SF
Construction
$13,900,000 est. value
Houston, TX 77073

University Drive Storage
New Construction - 547,400 SF
Construction
$4,300,000 est. value
Denton, TX 76207

Amazon Sorting Center
Build-Out - 307,840 SF
Pending Verification
Kyle, TX 78640

Dayton Storage
New Construction - 60,000 SF
Design
$6,000,000 est. value
Dayton, TX 77535

42' - 8 ring Grain Bin
New Construction
Bidding
Rosharon, TX 77583

Reported 08/13/2021 12:00 AM
Project Title

Contract to Construct an Equipment Storage Cover Addition at the City Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77705   (Jefferson County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, supervision, and equipment to construct an equipment storage cover addition at the City Water Reclamation Facility located at 4900 Lafin Road, Beaumont, Texas 77705.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents