Similar Projects
I-475 over Davison - Broadway Avenues Bridge Replacement
New Construction
Conception
$13,133,000 est. value
MI

Berston Field House Renovation And Expansion
Addition, Demolition, Renovation, Infrastructure - 57,000 SF
Conception
$14,000,000 CJ est. value
Flint, MI 48505

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 CJ est. value
Fenton, MI 48430

Enid Boulevard and Golden Shores Subdivision
Infrastructure
Bidding
$300,000 CJ est. value
Flint, MI 48502

Enid Boulevard and Golden Shores Subdivision
Infrastructure
Bidding
$300,000 CJ est. value
Flint, MI 48502

Asphalt Removal and Replacement
Term Contract
Post-Bid
Flint, MI 48505

Harrison Street Parking Lot Improvements
Alteration
Post-Bid
Flint, MI 48502

0.22 MI of Road Grade Correction including Hot Mix Asphalt Resurfacing, Drainage, Culvert, Sewer and Pavement Markings
Results
MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Silver Lake Road Senior Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Fenton, MI 48430

Silver Lake Road Senior Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Fenton, MI 48430

I-475 From Thread Creek to Flint River Rebuild
Demolition, New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Flint, MI 48505

I-475 From Thread Creek to Flint River Rebuild
Demolition, New Construction, Infrastructure
Pending Verification
$84,000,000 CJ est. value
Flint, MI 48505

M-54 Over Gilkey Creek - Bridge Replacement - 202002 - Genesee County Metropolitan Planning Commission
Demolition, New Construction, Infrastructure
Conception
$6,288,615 CJ est. value
Flint, MI 48505

Last Updated 12/07/2022 06:29 PM
Project Title

I-475 - Five Structures on I-475 - Bridge Rehabilitation - 204779 - Genesee County Metropolitan Planning Commission

Physical Address View project details and contacts
City, State (County) Flint, MI 48503   (Genesee County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,588,039 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I-475 - Five Structures on I-475- Primary Comments Work Type - Bridge Rehabilitation Project Description - Deep Overlay and Epoxy Overlays This project is included in the Genesee County Metropolitan Planning Commission's 2023-2026 Capital Improvement Plan (CIP). As of December 6, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents