Similar Projects
Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Modernize Basement Kitchen and Morgue
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Columbia, MO 65201

Milling and Overlay at Clary-shy Community Park, Activity Recreation Center (Arc)
Infrastructure
Bidding
$900,000 CJ est. value
Columbia, MO 65203

LED Parking Lighting Fixtures and Poles Qualified Vendors List
Term Contract
Sub-Bidding
Columbia, MO 65205

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Earth Moving Services - Multi Year
Term Contract, Infrastructure
Post-Bid
Columbia, MO

Sitework Services
Term Contract
Results
Columbia, MO

Resurface North and South Parking Lots at 1601 Old Highway 63 South
Infrastructure
Results
Columbia, MO 65201

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

4230 Philips Farm Road - Discovery Park Dermatology Build Out
New Construction, Infrastructure - 31,986 SF
Bidding
$3,600,000 CJ est. value
Columbia, MO 65201

Parking Lot Addition and a Pre-Engineered Metal Building Shelter
Addition, Infrastructure
Post-Bid
Centralia, MO

Rock Bridge High Peach Tree Connector Driveway
Infrastructure
Results
Columbia, MO 65203

Virginia Avenue Parking Structure - Relocate C-Store From Pershing Hall
Demolition, New Construction, Infrastructure
Bidding
$613,885 CJ est. value
Columbia, MO 65201

Parking Lot and Play Court Striping - Multi Year
Term Contract
Post-Bid
Columbia, MO

Last Updated 08/09/2022 09:07 AM
Project Title

2022 Parking Lot Mill and Overlay

Physical Address View project details and contacts
City, State (County) Columbia, MO 65202   (Boone County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $45,025 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Boone County is requesting bids for the furnishing of all labor, equipment, and traffic control necessary to complete the following: Asphalt Mill and Overlay: remove and replace asphalt for two County owned parking lots including butt joint milling and 1.5 inch overlay. Questions Submission Deadline Monday, June 27, 2022 3:00PM All technical questions must be submitted in writing to Doug Coley, Project Manager, at Dcoley@BooneCountyMO.org.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents