Similar Projects
Runway 7/25 South Parallel Taxiway P - Phase 1 Grading and Drainage
Infrastructure
Bidding
$400,000 est. value
Rockford, IL 61109

F.O.B. Co./Twp. Yard: Var. Pipe Culverts, Connect Bands, End Sections
Post-Bid
IL

Devon Avenue and Thomas Drive Drainage Improvements
Alteration
Post-Bid
Loves Park, IL

W912EK21B0009 - Illinois River Basin, Illinois Waterway Mechanical Dredging
Results
$10,000,000 to $25,000,000 est. value

Cherry Valley Township Pavement Resurface
Infrastructure
Results
Cherry Valley, IL

Pipe Culvert
Infrastructure
Post-Bid
Rockford, IL

C.H. 17 (Latham Road) Culvert Replacement
Infrastructure
Results
Rockford, IL

Manhole Frames And Lids
Alteration
Post-Bid
Rockford, IL

Harrison Avenue Box Culvert Repairs 2021
Infrastructure
Results
$45,500 est. value
Cherry Valley, IL 61016

Sinnissippi Erosion Repairs
Infrastructure
Post-Bid
$200,000 est. value
Rockford, IL

Auburn Street CCDD Facility
Infrastructure
Results
Rockford, IL 61105

Unnamed Creek Improvements
Infrastructure
Results
Loves Park, IL

Gregory Heights Drainage Improvements Phase 2
Infrastructure
Results
$692,261 est. value
Rockford, IL

Pecatonica Commercial Development
Infrastructure
Results
Pecatonica, IL 61063

City-Wide Inlet Repairs 2022
Infrastructure
Results
Rockford, IL

Reported 07/12/2022 12:00 AM
Project Title

Regional Detention Maintenance

Physical Address View project details and contacts
City, State (County) Cherry Valley, IL   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $323,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the Regional Detention Maintenance of the upper and lower ponds which includes pond excavation & dredging, spoil spreading and site restoration. All bidders shall note the following: (1) construction monies will be drawn from local funds on hand: (2) the successful contractor will be paid on a monthly basis according to the approved estimate of completed work: (3) the Village strongly urges all contractors to employ the use of local subcontractors, suppliers, and trades as much as possible for this contract. Labor rates shall be in accordance with the General Prevailing Rate of Wages for the Village of Cherry Valley, Winnebago County, Illinois, and which are on file in the Office of the Department of Labor, Springfield, Illinois. Such rates shall be paid for all laborers, workman, or tradesman performing work under this contract. The Village reserves the right to reject any or all bids on each proposal, and to waive any information there in or to accept any proposal considered in the best interest of the Village. No bid shall be withdrawn after the opening of bids without written consent of the Village of Cherry Valley for a period of forty five (45) days after the scheduled time of closing of bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents