Similar Projects
Sulphur Springs Road Stormwater Improvement Project
Alteration
Bidding
$986,000 est. value
Asheville, NC 28806

Asheville High School Media Center Improvements
Infrastructure, Alteration
Bidding
Asheville, NC 28803

South Main Street and Southern Avenue Stormwater Improvements
Post-Bid
$893,000 est. value
Raeford, NC 28361

Repair Culvert Cross Street (20-0017)
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

2018 Golden LEAF Disaster Recovery Project Contract No. 2 - Sanitary Sewer and Storm Sewer
Results
Parmele, NC

Chemical Grouting and Pipe Lining Services
Results
Charlotte, NC

Water/Sewer Service Installation
New Construction - 4,111 SF
Construction
Spring Lake, NC

Julia Avenue Culvert Replacement
Post-Bid
Belmont, NC 28012

Underground Utility Repair
Term Contract
Results
Raleigh, NC 27610

Storm-Damaged Drainage System Engineering Services and Construction Repair Project
Post-Bid
Apex, Kinston, NC 27502

Stormwater Project
Results
Princeville, NC 27886

1st Street Stormwater Improvements
Post-Bid
Beaufort, NC 28516

Cedrow Subdivision
Results
High Point, NC 27261

Operation Maintenance and Mangement of Water and Wastewater Systems
Term Contract
Post-Bid
Wentworth, NC 27375

Storm water Maintenance Service
Results
Bolivia, NC 28422

Last Updated 07/09/2021 12:32 PM
Project Title

EWP DSR PROJECT #5038-501 FLEA MARKET

Physical Address View project details and contacts
City, State (County) Fayetteville, NC   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located off Bragg Blvd in Fayetteville, NC. The project involves the installation of a drop manhole and approximately 28 LF of new 72-inch diameter RCP, and headwall at the outlet. Rip rap, gabion baskets, and a plunge pool will be added for stability of downstream. Approximately 0.4 acre of land will be disturbed for the construction of the storm pipe and headwall as well as access within the limits of construction shown on the plans. All disturbed areas will be sodded or otherwise stabilized as indicated on the drawings. Temporary sediment fence will be placed within the limits of construction at strategic locations to inhibit the flow of stormwater runoff onto site and prohibit the flow of sediment off site.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents