Similar Projects
Stanley White Recreation Center
New Construction
Conception
$8,000,000 est. value
New Bern, NC 28560

New Brunson Elementary School
New Construction
Conception
Winston-Salem, NC 27101

Vance Elementary School Renovation & Repairs
Renovation - 81,975 SF
Design
$3,250,000 est. value
Asheville, NC 28806

Lake Norman Elementary Gym Classroom Addition
Addition
Design
$1,000,000 CJ est. value
Mooresville, NC 28117

Durham Public Schools Lakeview School Controls Replacement
Renovation
Bidding
$115,000 CJ est. value
Durham, NC 27704

Bottleless Water Cooler
Renovation
Bidding
$20,000 CJ est. value
Bolivia, NC 28422

Glenn Elementary Renovations & Addition
Addition, Demolition, Renovation, Infrastructure - 54,600 SF
Sub-Bidding
$12,000,000 CJ est. value
Durham, NC 27704

Subcontractors - New Es Hidden Valley, Jw Grier, Newell Relief Project
Renovation - 102,000 SF
Post-Bid
$34,697,022 est. value
Charlotte, NC 28215

New Elementary School Windsor Park, Winterfield, Idlewild Relief Roofing and Accessories
New Construction - 105,000 SF
Post-Bid
$37,197,022 est. value
Charlotte, NC

Bond Project Renovations Pleasant Grove Elementary School
Renovation - 49,999 SF
Results
Burlington, NC

Meekins Field Renovations Phase 2 and 3
Renovation
Results
Kill Devil Hills, NC 27948

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

Providence Day School
Renovation, Addition - 20,744 SF
Construction
$4,711,200 est. value
Charlotte, NC 28270

New Elementary School F Project
New Construction, Infrastructure - 108,000 SF
Pending Verification
$49,326,165 CJ est. value
Durham, NC 27713

Ashley Academy Replacement - 2016 Bond - Winston-Salem Forsyth County Schools
New Construction
Pending Verification
$9,000,000 est. value
Fayetteville, NC 28304

Last Updated 04/06/2023 06:06 AM
Project Title

Eastover-Central Elementary School HVAC Renovation

Physical Address View project details and contacts
City, State (County) Eastover, NC 28312   (Cumberland County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Elementary School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,224,849 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of replacement of the existing windows in the classrooms and replacement of twenty-three (23) existing window air conditioning units in kind. Included as an Alternate is the replacement of four (4) existing air-cooled split system units in kind serving the Gymnasium Building and additional window replacement at Building One. There will not be a pre-bid conference for the re-bid. Bid Bond is required. Certain MBE guidelines must be followed. Single prime bids will be accepted in accordance with G.S. 143-128. Requirements for bidding this project are as follows: 1. Three references of projects of this type and size from previously satisfied commercial customers. 2. Furnish NC License Number (G.S. Chapter 87 establishes licensing requirements for general, plumbing, heating, electrical, and refrigeration contractors for construction projects costing $30,000 or more). 3. Insurance - The Contractor shall provide, as required by law, insurance for his employees. The Cumberland County Schools assumes no liability for injuries or accidents related to the Contractual Agreement. The Contractor shall furnish a certificate to the Owner (Cumberland County Schools) as a Proof of Coverage. The Contractor shall maintain and pay the Insurance Coverage, which shall not be less than the following: 4. A. Workman's Compensation Statutory Employers Liability $1,000,000 Owner/Officer must be included in coverage B. General Liability (per person/per occurrence): 1. Bodily and Personal Liability $1,000,000/$2,000,000 2. Property Damage $1,000,000/$2,000,000 Aggregate C. Automobile Liability (per person/per occurrence) 1. Bodily Injury $1,000,000 2. Property Damage: $1,000,000 Aggregate D. Builder's Risk or Installation Floater Contract Amount* E. Excess Liability Coverage of $5,000,000 5. Recruitment of minority business participation in accordance with G.S. 143-128. The Owner reserves the right to reject any and all proposals.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents