Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Slurry Seals Type II, Sealcoat Bike Paths, Rotomilling, Street Overlays, Utility Adjustments, and Crack Seals
Infrastructure
Bidding
$764,550 CJ est. value
Park City, UT 84060

Slurry Seals Type II, Sealcoat Bike Paths, Rotomilling, Street Overlays, Utility Adjustments, and Crack Seals
Infrastructure
Bidding
$764,550 CJ est. value
Park City, UT 84060

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Marsac Avenue Water Line Replacement
Infrastructure
Results
Park City, UT 84060

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

RFQ Engineering - Bitner Ranch Road to Silver Creek - Intersection Design
Infrastructure
Conception
$400,000 CJ est. value
Park City, UT 84060

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

American Saddler Pipeline Replacement Project
Infrastructure
Results
$500,000 est. value
Park City, UT 84060

Last Updated 04/24/2023 02:42 PM
Project Title

Sunrise and Bench Creek Ditch Piping

Physical Address View project details and contacts
City, State (County) Kamas, UT 84036   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $832,038 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 24, 2023, the project has not been awarded. A timeline for award has not been confirmed. The Project includes the following Work: o 7300 feet of 26" HDPE pipe slip lined through existing 30" CMP o 630 feet of 26" HDPE pipe installed in an existing ditch o Installation of a precast inlet structure o Installation of a precast outlet structure o Installation of Air valve assemblies o Removal of an existing culvert structure o Filling of existing canals, grading, and reseeding o Removal and replacement of fence Est. Value: $ 590,000.00 Est. Completion Date: April 15, 2023 Questions during regarding the bid may be directed to Chris Thomsen (435) 823-8022. Irrigation season is typically April 15th to November 15th. Liquidated Damages: a. $2,000 per day for Substantial Completion b. $500 per day for Final Completion

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents