Similar Projects
Last Updated | 04/24/2023 02:42 PM |
Project Title | Sunrise and Bench Creek Ditch Piping |
Physical Address | View project details and contacts |
City, State (County) | Kamas, UT 84036 (Summit County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Bids by Invitation |
Project Status | Results, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $832,038 [brand] Estimate |
Plans Available from | Owner's Representative |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 24, 2023, the project has not been awarded. A timeline for award has not been confirmed. The Project includes the following Work: o 7300 feet of 26" HDPE pipe slip lined through existing 30" CMP o 630 feet of 26" HDPE pipe installed in an existing ditch o Installation of a precast inlet structure o Installation of a precast outlet structure o Installation of Air valve assemblies o Removal of an existing culvert structure o Filling of existing canals, grading, and reseeding o Removal and replacement of fence Est. Value: $ 590,000.00 Est. Completion Date: April 15, 2023 Questions during regarding the bid may be directed to Chris Thomsen (435) 823-8022. Irrigation season is typically April 15th to November 15th. Liquidated Damages: a. $2,000 per day for Substantial Completion b. $500 per day for Final Completion |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |