Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Wastewater Treatment Plant Main Lift Station Improvements
Renovation
Bidding
Durand, IL 61024

Lawrence Avenue Lift Station Rehabilitation
Renovation
Bidding
$300,000 est. value
Joliet, IL 60435

Low Lift Pump
Post-Bid
Winnetka, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Post 4 Lift Station Improvements
Results
Less than $533,904 est. value
Tinley Park, IL 60477

Ginger Creek North Lift Station Improvements
Results
Less than $1,100,000 est. value
Burr Ridge, IL 60527

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Phase 3 Water Supply Improvement Project
New Construction
Bidding
$300,000 est. value
Quincy, IL

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

Lift Station Rehabilitation PY19
Results
Less than $82,500 est. value
Alorton, Centreville, IL 62207

Lift Station #5 and Force Main Replacement Project
Renovation, Infrastructure
Bidding
$390,000 est. value
West Chicago, IL

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Pump Station Rehabilitation PY19
Results
Less than $60,000 est. value
Brooklyn, IL 62059

Last Updated 04/19/2022 05:01 PM
Project Title

Campground Dump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Zion, IL 60099   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing campground sanitary Dump Station located in Illinois Beach State Park has failed. After further inspection, it was determined that the two (2) existing 2” grinder pumps, associated stainless steel rail system, and electrical controls, are beyond repair, and need replaced. SCOPE OF WORK: Disconnect and remove two (2) existing 2” grinder pumps (Weil Pump Model 2500), associated wiring, and associated stainless steel rail system. Disconnect and remove existing control panel and associated wiring. Disconnect and remove all existing floats and associated control wiring. Provide and install two (2) new 1.5 horsepower (minimum) grinder pumps and associated wiring. Each pump is to be rated at 80 gallons per minute at 10 feet of Total Dynamic Head (TDH) minimum, and be rated at 20 A, 208/240 V, 60 Hz, 1 phase, and 1750 RPM (minimum). New pumps to include double opposed mechanical seal and 25 feet of power cable (minimum). Provide and install new stainless steel rail system per pump manufacturers recommendation. Provide and install new float system to control pumps. Provide and install new conduit, conductors, fasteners, boxes, straps, and fittings for above installation. Provide thermal overload and outer seal failure alarms on both new pumps. New control panel to include On/Off/Auto switches, run time meter, exterior alarm and light, in a NEMA 3R Rated enclosure. Control panel to rotate lead/ lag pumps for equal wear. Provide start up, testing, and new float elevations. All new work is to comply with the current National Electric Code (NEC) and the current Illinois State Plumbing Code (ISPC).

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents