Similar Projects
First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Houghton Road - 22nd Street To Irvington - SR1J - City Of Tucson
Infrastructure
Conception
$40,721,000 CJ est. value
Tucson, AZ 85747

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

22nd Street Mineral and Fossil Show Exhibit Hall / Tucson
New Construction, Infrastructure - 15,000 SF
Design
$13,000,000 CJ est. value
Tucson, AZ 85711

Tangerine Road Corridor Project- Phase 2B (Dove Mountain Boulevard/Twin Peaks Road to Tangerine Business Loop)
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Marana, AZ 85658

Ameri-Park / Marana - Revised
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Marana, AZ 85653

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Results
$15,495,176 CJ est. value
Tucson, AZ 85706

Pinal Airpark Airfield Improvements - Phase I
Infrastructure
Results
$8,904,710 CJ est. value
Marana, AZ 85653

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

River Road Townhome Development
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Tucson, AZ 85704

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

La Paloma Reclaimed Reservoir Rehabilitation - W310 - City of Tucson
Infrastructure
Conception
$2,289,700 CJ est. value
Tucson, AZ 85701

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

Richard Elias Mission Library Expansion and Renovation - Pima County
Addition, Demolition, Renovation, Infrastructure - 15,000 SF
Post-Bid
$1,000,000 CJ est. value
Tucson, AZ 85713

Last Updated 10/10/2023 06:32 AM
Project Title

Water Production Well #6 Davis-Monthan Air Force Base, AZ

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85708   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $5,175,175 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Water Well Production #6,-Monthan Air Force Base, ArizonaConstruction services for a new production water well to replace the out of service Well #6. Work includes mobilization to the , coordination and approval of pre-construction submittals, plans, and permits; mud rotary drilling, well construction and development, waterdistribution piping and distribution main connection, new well house for valving, electrical panels, controls, VFD, and communications, and disinfection unit; electrical supply and service, earthwork, security fencing with access gates, and new access drive. The construction of new well house will consist of split face CMU, standing seam metal roof with insulation, heating and cooling unit, separated electrical room and incidental related work. The new well house shall also be provided a new access road and chain link security fence with double leaf swing gate access. Estimated Range: Between $5,000,000.00 and $10,000,000.00. This procurement is a 100% Total Small Business Set-Aside. It is issued as an Invitation for Bid (IFB) which will result in the award of a single Firm-Fixed-Price (FFP) contract. The NAICS code is 237110, Water and Sewer Line and Related Structures Construction, with a sizestandard of $45.0M. Be advised this project may be delayed, postponed, canceled or revised at any time prior to award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents