Similar Projects
Fox College Parking Lot & Detention Addition
Conception
Tinley Park, IL

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Phase I and II Engineering Services
Infrastructure
Bidding
Barrington, IL

Architect-Engineer Environmental Services
Renovation, Term Contract
Bidding
$100,000 to $1,000,000 est. value

Architecture and Engineering Services
Term Contract
Post-Bid
Chicago, IL

143rd Street Traffic Signal Interconnect - Phase III Construction Engineering Services
Post-Bid
Orland Park, IL 60462

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Various Land Survey
Term Contract
Results
Less than $500,000 est. value
Schaumburg, IL 60168

Soils and Materials Testing and Engineering
Infrastructure
Bidding
Orland Park, IL

Brookfield Avenue Bridge Improvements
Post-Bid
Less than $2,800,000 est. value
Brookfield, IL 60513

Various Phase II Projects and Value Engineering
Term Contract
Results
Schaumburg, IL 60168

Deep Well 17 Rehabilitation Design and Inspections Services
Infrastructure
Bidding
Mount Prospect, IL

Upgrade AHU S10C Damen Bldg 1
Post-Bid
Chicago, IL 60612

Phase II Project Management, Various Traffic Control and Signage Review
Term Contract
Results
Less than $400,000 est. value
Schaumburg, IL 60168

Last Updated 01/20/2022 11:22 AM
Project Title

Wilke Road Resurfacing and Multi-Use Path Engineering

Physical Address View project details and contacts
City, State (County) Arlington Heights, IL   (Cook County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $3,380,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the resurfacing of Wilke Road from approximately 600 ft north of IL 62 (Algonquin Rd) to the Union Pacific Railroad just south of US 14 (Northwest Highway), a distance of approximately 13,570 ft, or 2.57 miles. Resurfacing includes intermittent curb & gutter, sidewalk and driveway removal and replacement, ADA sidewalk improvements, pavement milling, structure adjustments, loop detector replacement, paving, striping, landscape restoration, and all other ancillary work substantive to a road resurfacing project and as required due to project specific conditions. The project includes the extension of a concrete multi-use path along the east parkway of Wilke Road from Bray Court to north of Orchard Place connecting to the existing off-street path at the southern edge of Sunset Meadows Park. No ROW acquisition is anticipated for this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents