Similar Projects
Highway 40 West Sidewalk Connection Phase II
Bidding
Steamboat Springs, CO

County Parking Lots Crack Seal and Repair
Bidding
Frisco, CO 80443

Curb Repair for Holly Lot - Ahec-20402-D
Post-Bid
Denver, CO

2019 Sidewalks Project
Post-Bid
Highlands Ranch, CO

SRTS Thunder Valley Trail
Results
Less than $1,093,992 est. value
Frederick, CO 80530

2019 Concrete Replacement Program
Results
$135,000 to $165,000 est. value
Aurora, CO 80012

North Cheyenne Canon Powell Trailhead Parking Lot Construction
Bidding
Colorado Springs, CO

Providence Village Rec Center Landscape and Site Civil Improvements
New Construction
Post-Bid
Highlands Ranch, CO

2019 Citywide Concrete Spot Repairs, Phase 2
Results
Less than $495,082 est. value
Denver, CO 80202

Sidewalks on Poplar/Highway 24 9th-12th Street
Bidding
Leadville, CO

Concrete R & R at Various Locations
Post-Bid
Federal Heights, CO

Needham Elementary Connect Phase II
Results
Less than $1,000,000 est. value
Durango, CO

Construction of ADA Accessible Ramps, Curb, Gutter and Sidewalks
Bidding
Durango, CO

Fillmore North Mmt Route 6 Pedestrian and Transit Enhancements
Post-Bid
Colorado Springs, CO

South Federal Raised Medians project
Results
$1,000,000 to $5,000,000 est. value
CO

Last Updated 02/01/2021 04:20 AM
Project Title

HB1408 Accessibility Improvements Exterior Campus

Physical Address View project details and contacts
City, State (County) Gunnison, CO 81230   (Gunnison County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Several routes connecting facilities lack accessible routes altogether, and in many cases no route exists at all. The primary design needs are ensuring ADA compliance, for various ramps, crosswalks, sidewalks and academic building entries with stormwater/ice blockages that impact entries for those with and without disabilities. The design team will be responsible for coordinating all irrigation, landscape, lighting, utilities and fiber associated with work ensuring a clean finished fully sodded or rocked as appropriate. The design should require the surrounding landscape to be completed in a safe and finished fashion when construction is complete.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents