Similar Projects
Gaylord Regional Airport - Rehabilitate Runway 9-27 - Otsego County
Infrastructure
Conception
$6,700,000 CJ est. value
Gaylord, MI 49735

Gaylord Regional Airport - Rehabilitate Runway 9-27 - Otsego County
Infrastructure
Conception
$6,700,000 CJ est. value
Gaylord, MI 49735

Patrick Mankowski Elk Park Improvements
Infrastructure
Design
$500,000 CJ est. value
Gaylord, MI 49735

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Dover 33 Plugging Project
Infrastructure
Post-Bid
$271,000 CJ est. value
Vanderbilt, MI 49795

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

37.06 Mi of Lane Departure Mitigation Including Shoulder Widening, Sign Upgrades, Tree Clearing, Guardrail Work and Slope Flattening
Infrastructure
Results

Munson Healthcare East Region ASC
New Construction, Infrastructure
Pending Verification
$15,608,000 CJ est. value
Gaylord, MI 49735

Otsego Lake Campground Playground Upgrades - Otsego County
Infrastructure
Pending Verification
$200,200 CJ est. value
Gaylord, MI 49735

OCRC Theisen Road (Hallock Road to North Townline Road) - Otsego County
Infrastructure
Conception
$842,000 CJ est. value
Bagley Township, MI 49735

59.04 MI of Hot Mix Asphalt Crack Treatment and Pavement Markings on Various Routes
Infrastructure
Results

Otsego Lake Drain Outlet Control Structure Removal and Replacement Project
Infrastructure
Results
$409,970 CJ est. value
Gaylord, MI 49735

Gaylord High School Site Improvements and Boiler Replacement
Renovation, Infrastructure
Results
$21,921,635 CJ est. value
Gaylord, MI 49735

Last Updated 03/11/2023 08:33 AM
Project Title

Rest Area Site, Building Reconstruction, Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter and Sidewalk, Drainage, Signage, and Pavement Markings on I-75NB

Physical Address View project details and contacts
City, State (County) Gaylord, MI 49735   (Otsego County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $4,333,841 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

0.23 mi of rest area site, building reconstruction, hot mix asphalt reconstruction, concrete curb, gutter and sidewalk, drainage, signage, and pavement markings on I-75NB Gaylord Rest Area in the city of Gaylord, Otsego County. Control Sec Job No Federal No NH 69013 212025A 23A0268 Net classification required for this project is Prequalification Waived MI DOT - 2303 007 - Rest Area Site, Building Reconstruction, Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter and Sidewalk, Drainage, Signage, and Pavement Markings on I-75NB

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents