Similar Projects
SR 6 to Springfield Rd -
Infrastructure, Alteration
Conception
$670,000 est. value
PA

Erie's Bayfront Parkway Multimodal
Infrastructure, Alteration
Design
$66,919,254 est. value
Erie, PA 16511

PA 68 Corridor Improvements
Alteration
Design
$13,184,467 est. value
Butler, PA 16003

2021 Street Sweeping
Post-Bid
Exton, West Chester, PA 19341

2021 District Wide Bridge Cleaning
Post-Bid
$500,000 to $999,999 est. value

Qualifications for Vacant Land Stabilization and Vacant Land Maintenance
Results
Philadelphia, PA

Gravel Pit Reclamation
Results
$29,500 est. value
Waterford, PA 16441

309 Center Valley IC
Infrastructure, Alteration
Design
$44,845,035 est. value
Tamaqua, PA 18252

Dust Control
Post-Bid
Montrose, PA 18801

2021-2022 Snow Plowing and Salt Application
Term Contract
Results
Warrington, PA

Interstate 84 Cable Median Barrier
Infrastructure
Design
$350,000 est. value
Dunmore, PA 18512

Street Sweeping
Post-Bid
Mount Lebanon, PA

Township Annual Maintenance Contract
Term Contract
Results
Linwood, PA

US 20: Chestnut St to Imperial Parkway
Infrastructure, Alteration
Design
$2,294,838 est. value
Girard, PA 16417

020 PSP Erie HQ & Lab Snow Removal
Term Contract
Post-Bid
Erie, PA 17110

Reported 07/13/2022 12:00 AM
Project Title

Fort Indiantown Gap - Rehabilitate PA Veteran's Memorial Cemetery

Physical Address View project details and contacts
City, State (County) Annville, PA 17003   (Lebanon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $2,100,000 to $3,100,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to, masonry wall repairs that involves removal and resetting coping stones in new mortar setting bed at all walls. Providing new stainless-steel dowels that extend into the underlying concrete walls and removal of mortar wash at all walls. Excavation behind retaining walls to provide waterproofing and more reliable foundation drainage and reconstruction of stone veneer in areas of deterioration. The Goals for SDB participation: 16% The Goals for VBE participation: 3%

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents