Similar Projects
Gibson Pond Dam Replacement
Post-Bid
Lexington, SC

Town of Pageland Lake Terry Dam Repairs
Results
$40,000 to $45,000 est. value
Jefferson, SC

Twelve Mile Creek WCD Dam 12 (D1940)
Post-Bid
Pickens, SC

Repair of Twelve Mile Creek WCD Dam 12 (D1940)
Results
Less than $23,681 est. value
SC

FY20 Joint Based Charleston Cell Placement Area Dike Construction
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29403

Clearwater Lake Dam Repairs
Renovation
Results
$900,000 est. value
Clearwater, SC

FY20 AIWW Placement Area Dike Construction Charleston to Port Royal
Results
$5,000,000 to $10,000,000 est. value

FY20 AIWW Placement Area Dike Construction Charleston to Port Royal
Results
$5,000,000 to $10,000,000 est. value

Plum Island Wastewater Treatment Plant Interconnecting Tunnels
Post-Bid
$4,000,000 to $6,000,000 est. value
Charleston, SC 29401

Stone Lake Dam Outfall Stabilization
Results
Greenville, SC 29602

Emergency Repair - S-315 Gunter Road Pond Dam
Bidding
SC

Last Updated 11/18/2020 11:44 AM
Project Title

Fy19 Post 45 Clouter Creek South Cell Dike Raise

Physical Address View project details and contacts
City, State (County) Charleston, SC 29403   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fy19 Post 45 Clouter Creek South Cell Dike Raise: Work consists of furnishing all plant, equipment, labor, transportation, fuel, lubricant, supplies and materials; and performing all operations in connection with raising dikes and berms, installation of geotextile, and installation of new spillway systems in Clouter Creek Placement Area - South Cell, including clearing and appurtenant items.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents