Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

KY-9003
Infrastructure
Conception
$1,750,000 est. value
Harned, KY 40144

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Playworks Event Building & Restroom Building, Waterfront Development Corp., Phase IV
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Louisville, KY 40202

Asphalt Surface With Grade & Drain - US 25W
Infrastructure
Bidding
$7,629,421 CJ est. value
Williamsburg, KY 40769

Guardrail
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Hardinsburg, KY 40143

Wastewater Treatment Plant Improvements - Phase 1
Post-Bid
Middlesborough, KY

Gas and Water Utility Relocation
Post-Bid
Grayson, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Site Improvements
Results
Liberty, KY

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Gloria Terrell Drive Industrial Development
New Construction, Infrastructure - 350,000 SF
Pending Verification
$40,000,000 CJ est. value
Highland Heights, KY 41076

Newport Multi-Residential
New Construction, Infrastructure
Pending Verification
$320,000,000 CJ est. value
Newport, KY 41071

Construct Event and Conference Center - Murray State University
New Construction, Infrastructure
Conception
$8,198,000 CJ est. value
Murray, KY 42071

Last Updated 09/14/2022 10:03 AM
Project Title

Valves Replacement Raw Water Intake No.1

Physical Address View project details and contacts
City, State (County) Nicholasville, KY 40356   (Jessamine County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For the demolition and construction of raw water intake platform no. 1 improvements at the Nicholasville Water Treatment Plant, including replacement of 10" pump control valves and piping located on the steel platform, addition of a small structural steel platform to the intake structure, electrical upgrades and together with all related work as specified and shown on the Drawings The BIDDING DOCUMENTS, consisting of Advertisement for Bids, Instructions to Bidders, Bid, Bid Bond, Agreement, Notice of Award form, Notice to Proceed form, Construction Performance Bond, Construction Payment Bond, Sample Certificate of Insurance form, Application for Payment form, General Conditions, Supplemental General Conditions, Change Order form, Technical Specifications, Addenda, and Drawings, may be examined at the following locations: City of Nicholasville 517 N. Main Street Nicholasville, KY 40356 GRW Engineers, Inc. 801 Corporate Drive Lexington, KY 40503 The valve and piping demolition and construction shall initiate immediately and be complete within 75 days. The pump control valves, isolation valves, and emergency closure pump control panels are provided by the City of Nicholasville and will be onsite at the initiation of the contract. The remainder of the project may be completed within the contract time. Bids shall be accompanied by a bid bond or a certified check in an amount equal to five percent (5%) of the bid to ensure the execution of the contract for which the bid is made. In case the bid is not accepted, the check or bid bond will be returned to the bidder, but if the bid is accepted and the bidder shall refuse or neglect to enter into a contract with the City of Nicholasville within ten (10) days after the time he has been notified of the acceptance of his bid, the said check or bid bond shall be forfeited to the City of Nicholasville for the failure to do so. No bidder may withdraw his bid for a period of ninety (90) days after closing time scheduled for the receipt of bids. The City of Nicholasville reserves the right to waive informalities and to reject any and all bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents