Similar Projects
Speegleville Bridge Addition (Middle Bosque River) - City of Waco
Addition, Demolition, Infrastructure
Conception
$6,700,000 CJ est. value
Waco, TX 76712

Proposed Fire Station 15 - City of Waco
New Construction, Infrastructure - 8,200 SF
Conception
$4,089,000 CJ est. value
Waco, TX 76701

South Bosque Veterinary Clinic Addition
Addition, Demolition, Infrastructure - 1,969 SF
Design
$250,000 CJ est. value
Waco, TX 76712

Embassy Suites Development
Demolition, New Construction, Infrastructure - 15,000 SF
Design
$35,000,000 CJ est. value
Waco, TX 76701

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SH 06 - Miscellaneous Concrete Repair
Infrastructure
Bidding
$288,166 CJ est. value
Waco, TX 76712

Southeastern Freight Lines - Dock Expansion
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Robinson, TX 76706

2022 Mill and Overlay, Phase 2 District 4
Infrastructure
Post-Bid
$4,885,912 CJ est. value
Waco, TX 76701

The Basin Rock Climbing Gym / Hewitt - Rebid
New Construction, Infrastructure - 11,500 SF
Post-Bid
$1,800,000 CJ est. value
Hewitt, TX 76643

Foster Branch Addition Water Improvements Lots 1-6
Results
$60,000 est. value
Bruceville-Eddy, Cego, TX 76524

Summit Ridge Force Main Extension
Infrastructure
Results
$69,392 est. value
Woodway, TX 76712

New Waco High School
New Construction, Infrastructure
Construction
$119,000,000 CJ est. value
Waco, TX 76710

Temporary Infrastructure For Portable Buildings And Demolition Of The Science Wing At Tennyson Middle School
Demolition, Renovation, Infrastructure
Construction
$771,252 CJ est. value
Waco, TX 76710

Greater St. Stephen Missionary Baptist Church Building
New Construction, Infrastructure - 8,608 SF
Pending Verification
$980,000 CJ est. value
Waco, TX 76704

The Knauf Group Industrial Building / McGregor
New Construction, Infrastructure - 650,000 SF
Pending Verification
$322,000,000 CJ est. value
McGregor, TX 76657

Last Updated 02/10/2023 04:12 AM
Project Title

Taylor Street Wastewater Improvements

Physical Address View project details and contacts
City, State (County) Waco, TX 76704   (McLennan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $418,167 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Wastewater improvements that include the installation of approximately 735 linear feet of 12-inch PVC and 57 linear feet of 6-inch PVC line, and construction of 5 sanitary sewer manholes, complete and in place. Also, included is the abandonment of existing wastewater lines and manholes. For Information Contact: Daryle Bullard, Purchasing Services, 254-750-6616 Deadline for questions is 5:00 PM CST October 18, 2022 Tentatively, the final selection decision will be made and bidders will be notified of award by November 2022. This schedule is subject to change by the City. The City of Waco is seeking to have the work that is the subject of this RFB completed within 120 Calendar days from the date of the Notice to Proceed. Each submission must be accompanied by a certified check of the submitter, or a bid bond executed by the submitter as principal and having as surety thereon a surety company approved by the City in the amount of 5% of the submission. Vendors accept all risk of late delivery bids regardless of instance or fault. If using U.S. Mail, note that U.S. Mail is initially received at Waco City Hall and then delivered to the office of Purchasing Services by a City courier. That delivery may occur a day or more after being received at Waco City Hall. Allow additional time in advance of the bid due date for U.S. Mail delivery. If the Purchasing Office has not received the bids by the stated deadline, the bid will be returned unopened. Texas Government Code Chapter 2258 requires a worker employed by a contractor or subcontractor in the execution of a contract for the public work by or on behalf of political subdivision of the state to be paid a prevailing wage rate. For public works contracts, state law requires a Performance Bond if the contract is for an amount in excess of $100,000.00 and a Payment Bond if the contract is for an amount in excess of $50,000.00. The City of Waco reserves the right to reject any and all submittals. This issuance of this solicitation does not obligate the City to contract for expressed or implied services.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents