Similar Projects
51 - Airport Asphalt Pavement Repair - 390-2664 - City of Dubuque
Infrastructure
Conception
$325,000 est. value
Dubuque, IA 52003

Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Aldi #81 / Dubuque
New Construction, Infrastructure - 21,831 SF
Bidding
$4,000,000 CJ est. value
Dubuque, IA 52003

Aldi #81 / Dubuque
New Construction, Infrastructure - 21,831 SF
Bidding
$4,000,000 CJ est. value
Dubuque, IA 52003

Bridge Cleaning
Infrastructure
Post-Bid

HMA Resurfacing and Culvert Replacements on Flannagan Road and James Road
Infrastructure
Post-Bid
$300,000 est. value
Balltown, IA 52073

HMA Crack Filling - IOWA 130
Infrastructure
Results
IA

Pcc Patching
Infrastructure
Results

Five Flags Building Improvements - City of Dubuque
Renovation, Infrastructure
Pending Verification
$25,830,150 CJ est. value
Dubuque, IA 52001

Pennsylvania Avenue Widening - City of Dubuque
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dubuque, IA 52001

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895 - City Of Dubuque
Infrastructure
Conception
$305,800 CJ est. value
Dubuque, IA 52002

Aldi - Plaza 20 / Dubuque
New Construction, Infrastructure - 20,664 SF
Design
$3,400,000 CJ est. value
Dubuque, IA 52003

Construction Hangar 105
New Construction, Infrastructure - 12,000 SF
Bidding
$2,250,000 CJ est. value
Dubuque, IA 52003

Last Updated 04/14/2023 12:33 AM
Project Title

2023 Asphalt Overlay Ramp Project Four

Physical Address View project details and contacts
City, State (County) Dubuque, IA 52001   (Dubuque County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $71,949 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Dubuque, Iowa, reserves the right to reject any and all Bids. Work on the Project must be commenced within ten (10) calendar days after the Notice to Proceed has been issued July 17, 2023, and shall be fully completed by August 25, 2023. Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. 2023 Asphalt Overlay Ramp Project Four CIP # 3001227-4 5421000002 Replacement of fourteen (14) access ramps at 6 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Judson Dr at Asbury Rd, two single directional ramps. 2. Judson Dr at Vail Trail Ct, two single and one double directional ramps. 3. Judson Dr at Powers Ct, two single directional ramps. 4. Judson Dr at Judson Ct, two single directional ramps. 5. Judson Dr at Sundown Ct, two single directional ramps. 6. Judson Dr at Hillcrest Rd, two single directional ramps. The City of Dubuque in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d-2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, or disability in consideration for an award. No Pre-Bid will be held for this project. Call or Email the City of Dubuque Engineering Department with any questions regarding this project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents